Text
0
eUNITED
STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
STR!BUTION
ATLANTA,GEORGIA 30303
'In Reply Refer To:9
OCT Z 11980
RII:JRW
1OO
1
50-325/80-39
50-32
.0-3,6
-261/80-27
SRIE
Carolina Power and Light Company
ATTN:
J. A. Jones,
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by J. R. Wray of this office on September 4,
1980 of activities authorized by NRC Operating License Nos. DPR-71, DPR-62 and
DPR-23 for the Harris Energy and Environmental Center facility, and to the discu
ssion of our findings held with B. H. Webster at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report.
This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it
is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor
mation identified in the application is contained in
a separate part of the
document.
If we do not hear from you in this regard within the specified.period,
the report will be placed in the Public Document Room.
80120902(-.-..--
-
--
-
-
-
-
OCT 2 1 1980
Carolina Power and Light Company
-2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
J
Philip Stohr, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report Nos. 50-325/80-39,
50-324/80-36, and 50-261/80-27
cc w/encl:
R. Parsons, Site Manager
A. C. Tollison, Jr.,
Plant Manager
R. B. Starkey, Jr.,.
Plant Manager