ML14175B087
| ML14175B087 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/29/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14175B088 | List: |
| References | |
| NUDOCS 7910190041 | |
| Download: ML14175B087 (2) | |
See also: IR 05000261/1979017
Text
6R REG
o
UNITED STATES
r
0NUCLEAR
REGULATORY COMMISSION
REGION il
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
AUG2 9 1979
In Reply Refer To:
RII:TJMc
50-261/79-17
Carolina Power and Light Company
Attn:
J. A. Jones, Executive Vice President
and Chief Operating Officer
411 Fayetteville Street
Raleigh, North Carolina 27602
Gentlemen:
This refers to the inspection conducted by T. J. McHenry of this office on
August 7-10,
1979, of activities authorized by NRC Operating License No. DPR-23
for the H. B. Robinson, Unit 2 facility, and to the discussion of our findings
held with J. M. Curley at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it
is necessary that you make a written application within 20 days to
this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which it
is claimed that the information is proprietary, and should be prepared so that
proprietary information identified in the application is contained in a separate
part of the document.
If
we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
7910190
Carolina Power and Light
-2-
AUG 291979
Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report No. 50-261/79-17
cc w/encl:
R. B. Starkey, Jr., Plant Manager
Post Office Box 790
Hartsville, South Carolina
29550