Forwards IE Inspec Rept 50-261/78-21 on 780822-25 During Which No Items of Noncompliance Were Noted
ML14175A982
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/27/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175A983 List:
References
NUDOCS 7811080285
Download: ML14175A982 (2)


See also: IR 05000261/1978021

Text

N

L

REG (A

U N IT E D ST A T E S

tZ0.

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

SEP 2 7 1978

In Reply Refer To:

RII:TJM

50-261/78-21

Carolina Power and Light Company

ATTN:

Mr. J. A. Jones

Executive Vice President

Engineering, Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection conducted by Mr. T. J. McHenry of this office

on August 22-25, 1978, of activities authorized by NRC Operating License No.

DPR-23 for the H. B. Robinson 2 facility, and to the discussion of our findings

.

held with Mr. R. B. Starkey at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

@1g

SEP 27 1978

Carolina Power and Light Co.

-2

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No.

50-261/78-21

cc w/encl:

Mr. R. B. Starkey, Plant Manager

P. 0. Box 790

Hartsville, South Carolina

29550