ML14174B010
| ML14174B010 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/08/1992 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Watson R CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14174B011 | List: |
| References | |
| NUDOCS 9209220174 | |
| Download: ML14174B010 (3) | |
See also: IR 05000261/1992020
Text
8 11992
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN: Mr. R. A. Watson
Senior Vice President
Nuclear Generation
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/92-20
The NRC Systematic Assessment of Licensee Performance (SALP) has
been completed for your H. B. Robinson facility. The facility
was evaluated for the period March 31, 1991 through June 27,
1992.
The results of the evaluation are documented in the
enclosed Initial SALP Report. This report will be discussed with
you at a public meeting to be held at H. B. Robinson on
September 24, 1992, at 8:30 a.m.
.
The Performance of your H. B. Robinson facility was evaluated in
the functional areas of plant operations, radiological controls,
maintenance/surveillance, emergency preparedness, security,
engineering/technical support, and safety assessment/quality
verification. The assessment indicated that the overall
performance of H. B. Robinson was good and is improving with
plant operations, radiological controls and security exhibiting
superior performance.
Increased management oversight and attention to detail have been
contributing factors to improved performance in operations.
Although maintenance/surveillance and engineering/technical
support received qualitative ratings of good performance, the
performance in these areas was characterized as mixed, which
appears to be due at least in part, to the numerous initiatives
and heavy work load in these functional areas. The board
recommended increased management attention in both areas.
The board also noted that corrective actions were not always
effective in correcting problems.
Any comments you have concerning our evaluation of the perfor
mance of your H. B. Robinson facility should be submitted to this
office within 30 days following the date of our meeting. These
comments will be considered in the development of the Final SALP
Report. Your comments and a summary of our meeting will be
.
issued with the Final SALP Report.
9209220174 920906
ADOCK 05000261
$jol
G
8 1992
Carolina Power and Light Co.
2
Should you have any questions concerning this matter, we will be
glad to discuss them with you.
Sincerely,
Original signed by:
Stewart D. Ebneter
Stewart D. Ebneter
Regional Administrator
Enclosure:
Initial SALP Report
cc w/encl:
C. R. Dietz
Vice President
Robinson Nuclear Project Department
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
R. H. Chambers
Plant General Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Heyward G. Shealy, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
McCuen Morrell, Chairman
Darlington County Board of Supervisor
County Courthouse
Darlington, SC 29535
(cc w/encl cont'd -
See page 2)
8 1992
Carolina Power and Light Co.
3
(cc w/encl cont'd)
H. Ray Starling
bcc w/encl:
Vice President -
Legal Dept.
H. Christensen, Ru
Carolina Power and Light Co.
Document Control Desk
P. 0. Box 1551
Raleigh, NC 27602
NRC Resident Inspector
H. A. Cole
U.S. Nuclear Regulatory Cor.
Special Deputy Attorney General
Route 5, Box 413
State of North Carolina
Hartsville, SC
29550
P. 0. Box 629
Raleigh, NC 27602
The Chairman
K. C. Rogers, Commissioner
Robert Gruber
J. R. Curtiss, Commissioner
Executive Director
F. J. Remick, Commissioner
Public Staff - NCUC
J. M. Taylor, EDO
P. 0. Box 29520
J. H. Sniezek, DEDO
Raleigh, NC 27626-0520
J. F. Wechselberger, Regional
Coordinator, EDO
J. L. Harrison, Manager
T. E. Murley, NRR
Regulatory Compliance
S. Varga, NRR
H. B. Robinson Steam
E. G. Adensam, NRR
Electric Plant
B. Mozafari, NRR
P. 0. Box 790
F. Allenspach, SALP
Hartsville, SC 29550
Coordinator, NRR
W
Regional Administrators, RI,
RIII, RIV, and RV
Ms. Gayle B. Nichols
K. Clark, Ru, PAO
Staff Counsel
D. M. Verrelli, Ru
SC Public Service Commission
R. E. Carroll, Ru
P. 0. Box 11649
S. J. Vias, TSS
Columbia, SC 29211
DRS and DRSS Branch Chiefs,
and Section Chiefs
RII:DRP
RI DPRII:DRP
RII:
RH
Ch DVerrelli
I
Docmen
Control Des
09 //
209~
\\/924"rf 09/z//92
09/1./920
RINRC
RI
RII
PS
BMoza
Adendsam
cRu
5, Boff
yes
S09/1'/92
09/ ./921?1 09/
/929/
26/3
2