ML14174B010

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Rept 50-261/92-20 for Mar 1991 - June 1992
ML14174B010
Person / Time
Site: Robinson 
Issue date: 09/08/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML14174B011 List:
References
NUDOCS 9209220174
Download: ML14174B010 (3)


See also: IR 05000261/1992020

Text

SEP

8 11992

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/92-20

The NRC Systematic Assessment of Licensee Performance (SALP) has

been completed for your H. B. Robinson facility. The facility

was evaluated for the period March 31, 1991 through June 27,

1992.

The results of the evaluation are documented in the

enclosed Initial SALP Report. This report will be discussed with

you at a public meeting to be held at H. B. Robinson on

September 24, 1992, at 8:30 a.m.

.

The Performance of your H. B. Robinson facility was evaluated in

the functional areas of plant operations, radiological controls,

maintenance/surveillance, emergency preparedness, security,

engineering/technical support, and safety assessment/quality

verification. The assessment indicated that the overall

performance of H. B. Robinson was good and is improving with

plant operations, radiological controls and security exhibiting

superior performance.

Increased management oversight and attention to detail have been

contributing factors to improved performance in operations.

Although maintenance/surveillance and engineering/technical

support received qualitative ratings of good performance, the

performance in these areas was characterized as mixed, which

appears to be due at least in part, to the numerous initiatives

and heavy work load in these functional areas. The board

recommended increased management attention in both areas.

The board also noted that corrective actions were not always

effective in correcting problems.

Any comments you have concerning our evaluation of the perfor

mance of your H. B. Robinson facility should be submitted to this

office within 30 days following the date of our meeting. These

comments will be considered in the development of the Final SALP

Report. Your comments and a summary of our meeting will be

.

issued with the Final SALP Report.

9209220174 920906

PDR

ADOCK 05000261

$jol

G

PDR

SEP

8 1992

Carolina Power and Light Co.

2

Should you have any questions concerning this matter, we will be

glad to discuss them with you.

Sincerely,

Original signed by:

Stewart D. Ebneter

Stewart D. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report

cc w/encl:

C. R. Dietz

Vice President

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

R. H. Chambers

Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

McCuen Morrell, Chairman

Darlington County Board of Supervisor

County Courthouse

Darlington, SC 29535

(cc w/encl cont'd -

See page 2)

SEP

8 1992

Carolina Power and Light Co.

3

(cc w/encl cont'd)

H. Ray Starling

bcc w/encl:

Vice President -

Legal Dept.

H. Christensen, Ru

Carolina Power and Light Co.

Document Control Desk

P. 0. Box 1551

Raleigh, NC 27602

NRC Resident Inspector

H. A. Cole

U.S. Nuclear Regulatory Cor.

Special Deputy Attorney General

Route 5, Box 413

State of North Carolina

Hartsville, SC

29550

P. 0. Box 629

Raleigh, NC 27602

The Chairman

K. C. Rogers, Commissioner

Robert Gruber

J. R. Curtiss, Commissioner

Executive Director

F. J. Remick, Commissioner

Public Staff - NCUC

J. M. Taylor, EDO

P. 0. Box 29520

J. H. Sniezek, DEDO

Raleigh, NC 27626-0520

J. F. Wechselberger, Regional

Coordinator, EDO

J. L. Harrison, Manager

T. E. Murley, NRR

Regulatory Compliance

S. Varga, NRR

H. B. Robinson Steam

E. G. Adensam, NRR

Electric Plant

B. Mozafari, NRR

P. 0. Box 790

F. Allenspach, SALP

Hartsville, SC 29550

Coordinator, NRR

W

Regional Administrators, RI,

RIII, RIV, and RV

Ms. Gayle B. Nichols

K. Clark, Ru, PAO

Staff Counsel

D. M. Verrelli, Ru

SC Public Service Commission

R. E. Carroll, Ru

P. 0. Box 11649

S. J. Vias, TSS

Columbia, SC 29211

DRS and DRSS Branch Chiefs,

and Section Chiefs

INPO

RII:DRP

RI DPRII:DRP

RII:

DPR

RH

Ch DVerrelli

I

Docmen

Control Des

09 //

209~

\\/924"rf 09/z//92

09/1./920

RINRC

NRR

NRR

RI

RII

PS

BMoza

Adendsam

cRu

5, Boff

yes

S09/1'/92

09/ ./921?1 09/

/929/

26/3

2