ML14174A134
| ML14174A134 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 03/30/1979 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Engelken R, Grier B, James Keppler, James O'Reilly, Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML14174A131 | List: |
| References | |
| NUDOCS 7908030332 | |
| Download: ML14174A134 (1) | |
Text
March 30, 1979 NEMIORANDUM FOR:
B. H. Grier, Director, Region I J. P. O'Reilly, Director, Pegion II J. G. Keppler, Director, Region III K. V. Seyfrit, Director, Region IV R. H. Engelken, Director, Region V FRONI:
Norman C. Moseley, Director, Division of Reactor Operations Inspection, OIE
SUBJECT:
IE BULLETIN NO. 79-04, INCORRECT WEIGHTS FOR SWING CHECK VALVES NANUFACTURED BY VELAN ENGINEERING CORPORATIOff The subject IE Bulletin should be dispatched for action by March 30, 1979, to all power reactor facilities with an operating license or a construction permit.
The text of the bulletin and draft letter to the licensee are enclosed for this purpose.
Norman C. Moseley, Director Division of Reactor Operations Inspection Office of Inspection and Enforcement
Enclosures:
- 1. Draft Transmittal Letter
- 2.
IE Bulletin No. 79-04 CONTACT:
H. Wong, IE 49-23130 7908030 53