ML14167A375
| ML14167A375 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/12/2014 |
| From: | Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 102-06898-TNW/SPD, LER 13-004-00 | |
| Download: ML14167A375 (3) | |
Text
10 CFR 50.73 Qaps Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel 623 393 5764 102-06898-TNW/SPD June 12, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Reference:
Arizona Public Service Company (APS) Letter No.
102-06889, dated June 9, 2014, Licensee Event Report (LER) 2013-004-000
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 / License No. NPF 41 Correction to APS cover letter of Licensee Event Report (LER) 2013-004-00 Enclosed please find a corrected copy of the cover letter previously submitted in the referenced letter. Revision bars have been added to the left side of the affected page. The following changes were made to correct internal administrative errors:
The PVNGS internal letter log number located at the top left of the page was changed from 102-06889 to 102-06888. Letter log number 102-06889 was used on a document previously submitted to the Nuclear Regulatory Commission dated June 5, 2014.
NRC NRR Project Manager, M. M. Watford's name was misspelled.
Please update your files accordingly. APS makes no commitments in this letter. If you have questions, please contact Tom Weber, Department Leader, Regulatory Affairs, at (623) 393-5764.
Sincerely, q
aLU TNW/SPD/hsc Enclosure Cc:
M. L. Dapas J. K. Rankin M. M. Watford M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager PVNGS NRC NRR Project Manager PVNGS NRC Senior Resident Inspector PVNGS tC7 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- Wolf Creek
ENCLOSURE CORRECTION TO APS COVER LETTER OF LICENSEE EVENT REPORT 2013-004-00
,aps 10 CFR 50.73 DWIGHT C. MIMS Senior Vice President, Nuclear Regulatory & Oversight Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7605 Tel 623 393 5403 I
102-06888-DCM/SPD June 9, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528/License No. NPF 41 Licensee Event Report (LER) 2013-004-00 Enclosed please find LER 50-528/2013-004-00 that has been prepared and submitted pursuant to 10 CFR 50.73. This LER reports a condition prohibited by Technical Specification 3.7.2, Main Steam Isolation Valves.
In accordance with 10 CFR 50.4, copies of this LER are being forwarded to the Nuclear Regulatory Commission (NRC) Regional Office, NRC Region IV, and the Senior Resident Inspector.
Arizona Public Service Company makes no commitments in this letter. If you have questions regarding this submittal, please contact Mark McGhee, Department Leader, Regulatory Affairs, at (623) 393-4972.
Sincerely,
[original signed by Dwight Mims]
DCM/SPD/hsc Enclosure Cc:
M. L.
J. K.
M. M.
M. A.
Dapas Rankin Watford Brown NRC Region IV Regional Administrator NRC NRR Project Manager PVNGS NRC NRR Project Manager PVNGS NRC Senior Resident Inspector PVNGS I
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak, Diablo Canyon
- Palo Verde
- Wolf Creek