NRR E-mail Capture - Acceptance Review - Fort Calhoun LAR - TS 2.5, Auxiliary Feedwater (AFW) System
ML14162A599
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/11/2014
From: Jennivine Rankin
Plant Licensing Branch IV
To: Edwards M, Hansher B
Omaha Public Power District
References
Download: ML14162A599 (2)


Text

NRR-PMDAPEm Resource From: Rankin, Jennivine Sent: Wednesday, June 11, 2014 2:37 PM To: BHansher@oppd.com; medwards@oppd.com Cc: Sebrosky, Joseph

Subject:

Acceptance Review - Fort Calhoun LAR - TS 2.5, Auxiliary Feedwater (AFW) System Mr. Hansher and Mr. Edwards, By letter dated March 31, 2014 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML14090A417), Omaha Public Power District (OPPD) submitted a license amendment request for Fort Calhoun Station, Unit 1 (FCS). The proposed amendment would change the technical specification 2.5, Auxiliary Feedwater (AFW) System to allow a 7 day completion time for the turbine-driven AFW pump if the inoperability occurs following a refueling outage and if MODE 2 has not been entered.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1530.

Thanks, Jennie Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 1355 Mail Envelope Properties (Jennivine.Rankin@nrc.gov20140611143700)

Subject:

Acceptance Review - Fort Calhoun LAR - TS 2.5, Auxiliary Feedwater (AFW)

System Sent Date: 6/11/2014 2:37:28 PM Received Date: 6/11/2014 2:37:00 PM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:

"Sebrosky, Joseph" <Joseph.Sebrosky@nrc.gov>

Tracking Status: None "BHansher@oppd.com" <BHansher@oppd.com>

Tracking Status: None "medwards@oppd.com" <medwards@oppd.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2736 6/11/2014 2:37:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: