ML14107A338

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Watts Bar Nuclear Plant
ML14107A338
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/16/2014
From: Bartley J
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
Download: ML14107A338 (25)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 16, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- ANNUAL ASSESSMENT MEETING WATTS BAR NUCLEAR PLANT - DOCKET NO. 50- 390

Dear Mr. Shea:

This refers to the meeting conducted on April 3, 2014, near the Watts Bar Nuclear Plant in Sweetwater TN. The purpose of this meeting was to discuss the NRC's Reactor Oversight Process (ROP) and the NRC's annual assessment of plant safety performance for the period of January 1, 2013, to December 31, 2013. The major topics addressed were the NRC's assessment program and the results of the assessment. The slides presented during the meeting are enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4521.

Sincerely,

/Craig Kontz RA for/

Jonathan Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90

Enclosures:

1. List of Attendees
2. 2013 EOC WB Public Presentation cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE DLR /RA for/ CRK /RA for/

NAME CKontz JBartley DATE 04/16/2014 04/16/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan H. Bartley dated April 16, 2014

SUBJECT:

PUBLIC MEETING

SUMMARY

- ANNUAL ASSESSMENT MEETING WATTS BAR NUCLEAR PLANT - DOCKET NO. 50- 390 DISTRIBUTION:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource

J. Shea 3 NRC Attendees R. Croteau, Director, Division of Reactor Projects, RII C. Kontz, Senior Project Engineer, Reactor Projects Branch 6, DRP, RII B. Monk, Senior Resident Inspector, Watts Bar Unit 1, DRP, RII K. Miller, Resident Inspector, Watts Bar Unit 1, DRP, RII T. Nazario, Senior Resident Inspector, Watts Bar Unit 2, DRP, RII Enclosure 1

2 WATTS BAR PUBLIC MEETING Sweetwater Tn April 3, 2014 Attendees Name (Print) Title and Organization L. Monk Public G. Johnston MATRR/BEST G. Morgan MATRR/BEST Blake Nelson TVA John Laffrey TVA Jim ODell TVA Gordon Arent TVA Mike Skaggs TVA Kay Whittenburg TVA Joe Calle TVA Bob Williams TVA Nick Welch TVA Ed Freeman TVA Ray Hruby TVA Enclosure 1