ML14099A137
| ML14099A137 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/17/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML14099A138 | List: |
| References | |
| NUDOCS 7906140150 | |
| Download: ML14099A137 (2) | |
See also: IR 05000348/1979015
Text
tptREOU4
UNITED STATES
,oF
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
X
ATLANTA, GEORGIA 30303
- op
APR 1 7 1979
In Reply Refer To:
RII:AGW
50-364/79-05
50-348/79-15
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. 0. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by A. G. Wagner of this office on
April 2-7, 1979, of activities authorized by NRC License No. NPF-2 and
Construction Permit No. CPPR-86 for the Farley Unit I and 2 facilities, and
to the discussion of our findings held with W. G. Hairston at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
90614 0 /5:oD6
APR 1 7 1979
Alabama Power Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report Nos. 50-536/79-05
and 50-348/79-15
cc w/encl:
A. R. Barton
Executive Vice President
P. 0. Box 2641
Birmingham, AL 35291
H. 0. Thrash
Manager-Nuclear Generation
P. 0. Box 2641
Birmingham, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
P. 0. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. 0. Box U
Ashford, AL 36312
9