Other: ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 14-0024, Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ET 16-0008, Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events., ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events., ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan, ML13070A026, ML16168A254
|
MONTHYEARML13070A0262013-02-28028 February 2013 Operating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-28028 August 2013 Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-26026 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other WO 14-0023, Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.22014-03-31031 March 2014 Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2 Project stage: Request ET 14-0024, Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-28028 August 2014 Third Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 15-0005, Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-02-24024 February 2015 Operating Corporation'S Fourth Six - Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-25025 August 2015 Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ET 16-0008, Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-02-17017 February 2016 Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Other ML16168A2542016-07-0606 July 2016 Report for the Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 Project stage: Other ET 16-0018, Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2016-08-18018 August 2016 Seventh Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Other ET 17-0003, Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan2017-01-19019 January 2017 Operating Corporation'S Compliance Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Final Integrated Plan Project stage: Other ML17171A2332017-06-12012 June 2017 Response to Request for FLEX Audit Documentation Project stage: Request ML17144A0092017-08-0202 August 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-08-25
[Table View] |
|
---|
Category:Letter type:WO
MONTHYEARWO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations WO 23-0009, Financial Protection Levels2023-03-31031 March 2023 Financial Protection Levels WO 23-0002, Written Part 21 Notification of a Defect Associated with Imi CCI Supplied Main Steam and Main Feedwater Isolation Valves2023-01-11011 January 2023 Written Part 21 Notification of a Defect Associated with Imi CCI Supplied Main Steam and Main Feedwater Isolation Valves WO 22-0056, Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums2022-05-0606 May 2022 Generation Station - Guarantee of Payment of Deferred Premiums WO 22-0011, Operating Corp., Financial Protection Levels2022-03-29029 March 2022 Operating Corp., Financial Protection Levels WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-0909 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082021-12-29029 December 2021 Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness2021-08-12012 August 2021 (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness2021-07-29029 July 2021 One-Time Request for Exemption from the Biennial Emergency Preparedness WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan2021-05-25025 May 2021 License Amendment Request (LAR) for Revision to the Emergency Plan WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums2021-05-0707 May 2021 Operating Corp - Guarantee of Payment of Deferred Premiums WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-14014 April 2021 Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations WO 21-0014, Financial Protection Levels2021-03-30030 March 2021 Financial Protection Levels WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report2021-03-11011 March 2021 Submittal of Revision 34 to Updated Safety Analysis Report WO 21-0002, Notification of Readiness for Supplemental Inspection 927232021-01-28028 January 2021 Notification of Readiness for Supplemental Inspection 92723 WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange2020-11-10010 November 2020 License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report2020-07-23023 July 2020 Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0047, Guarantee of Payment of Deferred Premiums2020-05-0707 May 2020 Guarantee of Payment of Deferred Premiums WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2020-04-20020 April 2020 License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies WO 20-0024, Financial Protection Levels2020-03-31031 March 2020 Financial Protection Levels WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082019-12-23023 December 2019 Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System2019-08-29029 August 2019 License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-08-0808 August 2019 Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 19-0011, Financial Protection Levels2019-03-27027 March 2019 Financial Protection Levels WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 42019-03-11011 March 2019 Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan2018-11-19019 November 2018 Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-11-15015 November 2018 Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection2018-08-15015 August 2018 Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term2018-08-0909 August 2018 Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 12018-07-23023 July 2018 Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 WO 18-0016, License Amendment Request for Revision to the Emergency Plan2018-05-0909 May 2018 License Amendment Request for Revision to the Emergency Plan WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-16016 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2018-04-0505 April 2018 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...2018-01-15015 January 2018 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan2017-12-19019 December 2017 License Amendment Request (LAR) for Revision to the Emergency Plan WO 17-0092, Request for Regulatory Conference (EA-17-149)2017-11-0808 November 2017 Request for Regulatory Conference (EA-17-149) WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary2017-10-10010 October 2017 Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme2017-04-26026 April 2017 Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-04-20020 April 2017 Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-04-17017 April 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2017-03-27027 March 2017 Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses2017-03-22022 March 2017 Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme2017-03-16016 March 2017 Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme WO 17-0009, Revision 30 to Updated Safety Analysis Report2017-03-0909 March 2017 Revision 30 to Updated Safety Analysis Report WO 16-0068, Docket No. 50-482: Request for Regulatory Conference2016-12-21021 December 2016 Docket No. 50-482: Request for Regulatory Conference 2023-05-17
[Table view] |
Text
w0 LF CREEK NUCLEAR OPERATING CORPORATION Russell A. Smith March 31, 2014 Site Vice President and Chief Nuclear Operating Officer WO 14-0023 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1) Letter dated March 12, 2012, from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events"
- 2) Letter WO 13-0014, dated February 28, 2013, from R. A. Smith, WCNOC, to USNRC
Subject:
Docket No. 50-482: Request for Schedule Relaxation of NRC Order EA-12-049, Requirement IV.A.2, at Wolf Creek Generating Station Gentlemen:
This letter transmits a request for relaxation of the requirements contained in Nuclear Regulatory Commission (NRC) Order EA-12-049. On March 12, 2012, the NRC issued an Order (Reference 1) to Wolf Creek Nuclear Operating Corporation (WCNOC). Reference 1 was immediately effective and directs WCNOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a Beyond-Design-Basis External Event (BDBEE). As described in the Overall Integrated Plan (OIP) for Wolf Creek Generating Station (WCGS) (Reference 2), one requirement of the mitigation strategies is dependent upon installation of Westinghouse low leakage Reactor Coolant Pump (RCP) shutdown seals (SHIELD seals). The WCGS mitigation strategies are also dependent upon implementation of a missile protected water source for Auxiliary Feedwater (Condensate Storage Tank (CST)).
WCNOC installed the second generation (Gen II) SHIELD seals at WCGS during refueling outage 19 (fall 2013). Recent post-operational testing of the SHIELD seals at another plant has resulted in the need to enhance the SHIELD design. In addition, the current CST does not meet the missile protection requirements in NEI 12-06, Section 7, and is therefore not creditable for "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," Revision 0, as is.
WCNOC is pursuing two avenues to ensure a seismic and missile protected water source exists P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNVET
WO 14-0023 Page 2 of 3 to meet Beyond Design Basis External Event requirements. The first is seismic qualification and missile protection of the existing Condensate Storage Tank (CST). The second is design and construction of an independent tank that meets the seismic and missile protection requirements of NEI 12-06. An extension of one additional refueling cycle to the completion of the fall 2016 refueling outage is therefore requested to install the next generation seal and modify the CST.
Section IV of NRC Order EA-12-049 (Reference 1) specifies that licensees proposing to deviate from requirements contained in NRC Order EA-12-049 may request that the Director, Office of Nuclear Reactor Regulation, relax those requirements. Therefore, in accordance with Section IV of NRC Order EA-12-049, WCNOC is requesting that the Director, Office of Nuclear Reactor Regulation, relax the requirement for completion of full implementation as prescribed in Section IV.A.2 of NRC Order EA-1 2-049 and as described in the attachment to this letter.
WCNOC considers that, upon approval by the NRC, the alternative full implementation dates regarding NRC Order EA-12-049 proposed in the attachment will constitute a condition of NRC Order EA-1 2-049 for WCGS. Therefore, there are no new regulatory commitments contained in this letter.
If you have any questions concerning this matter, please contact me at (620) 364-4156, or Mr.
Michael J. Westman at (620) 364-4009.
Sincerely, Russell A. Smith RAS/rlt Attachment cc: M. L. Dapas (NRC), w/a C. F. Lyon (NRC), w/a N. F. O'Keefe (NRC), w/a Senior Resident Inspector (NRC), w/a
WO 14-0023 Page 3 of 3 STATE OF KANSAS )
COUNTY OF COFFEY )
Russell A. Smith, of lawful age, being first duly sworn upon oath says that he is Site Vice President and Chief Nuclear Operating Officer of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By__ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Rus el1 A. Smith Site Vice President and Chief Nuclear Operating Officer SUBSCRIBED and sworn to before me this 31 :-'dday of (Y*aPah ,2014.
I -A/am VLWJ
- -..PUBOTLRC.
' RHONDA My L.TIEMEYER Appointment Expires January 11, 2018 I! Notary Public Expiration Date9,1/iiJ; I/4L/
Q4
)f0'
Attachment to WO 14-0023 Page 1 of 3 REQUEST FOR RELAXATION OF NRC ORDER EA-12-049 REQUIREMENT IV.A.2 FOR WOLF CREEK GENERATING STATION Relaxation Request Pursuant to the procedure specified in Section IV of Nuclear Regulatory Commission (NRC)
Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (Reference 1), Wolf Creek Nuclear Operating Corporation (WCNOC) hereby submits a request for schedule relaxation from the Order requirements for completion of full implementation for Wolf Creek Generating Station (WCGS) either no later than two (2) refueling cycles after submittal of the Overall Integrated Plan (OIP), as required in Condition C.I.a of the Order, or December 31, 2016, whichever comes first.
Order Requirement from Which Relaxation is Requested SHIELD Seals NRC Order EA-12-049,Section IV.A.2 requires completion of full implementation of the Order requirements either no later than two (2) refueling cycles after submittal of the OIP, as required by Condition C.1.a, or December 31, 2016, whichever comes first. In accordance with the requirements of the Order, WCNOC submitted the OIP for WCGS (Reference 2) on February 28, 2013. The OIP milestone schedule identified the completion dates for full implementation of NRC Order EA-12-049 as completion of the spring 2015 refueling outage for WCGS.
NRC Order EA-12-049 requires the development, implementation, and maintenance of guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a Beyond-Design-Basis External Events (BDBEE). As described in the OIP for WCGS, these mitigation strategies are dependent upon installation of Westinghouse low leakage Reactor Coolant Pump (RCP) shutdown seals (SHIELD seals).
WCNOC recently installed the second generation (Gen II) SHIELD seals at WCGS during refueling outage 19 (fall 2013). Recent post-operational testing of the SHIELD seals at another plant has resulted in the need to enhance the SHIELD design. The new seals will ensure the safety functions of containment integrity (during an extended loss of alternating current power or ELAP), and core cooling (RCS inventory and level) are maintained for BDBEEs.
CondensateStorage Tank In addition to the SHIELD seals, the WCGS mitigation strategies are dependent upon a protected water source for Auxiliary Feedwater (Condensate Storage Tank (CST)). The current CST does not meet seismic requirements of Expedited Seismic Evaluation Process (ESEP) or the missile protection requirements in NEI 12-06 "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," Revision 0, Section 7 and therefore is not creditable for FLEX as is. WCNOC is pursuing two avenues to ensure a seismic and missile protected water source exists to meet Beyond Design Basis External Event requirements. The first is seismic qualification and missile protection of the existing Condensate Storage Tank (CST). The second is design and construction of an independent tank that meets the seismic and missile protection requirements of NEI 12-06.
Attachment to WO 14-0023 Page 2 of 3 Justification for Relaxation Request SHIELD Seals The SHIELD seals provide additional safety margin during a BDBEE by serving as a passive means of protecting the reactor. The seals reduce the risk to the plant (Core Damage Frequency) by limiting the loss of reactor coolant system (RCS) water inventory during the event.
The implications of the failure of Westinghouse SHIELD shutdown seals for RCPs are currently being assessed. Resolution of issues will require additional analytical work, and a FLEX white paper and Topical Report are being developed by Westinghouse to provide the NRC with appropriate data to have higher confidence in the next generation SHIELD design. The FLEX white paper is expected to be submitted to the NRC in March 2014. The Topical Report is expected to be issued to the NRC in March 2014. Upon receipt of these documents, NRC review and acceptance of the next generation seals would be required.
Based on this timeline, full implementation of the mitigation strategies in accordance with NRC Order EA-12-049 would not be completed by the Order requirement date, since NRC acceptance of the Topical Report is essential to the full implementation of mitigation strategies required by the Order. The current required implementation date is completion of the spring 2015 refueling outage. An extension of one additional refueling cycle is requested, which would move the implementation date to completion of the fall 2016 refueling outage, which is still within the maximum allowed timeframe of December 2016. The extension would provide additional time for Westinghouse to fully design, test, qualify, and obtain NRC acceptance on the new generation seals, and for WCNOC to safely plan, schedule, and install the next generation SHIELD seals at the WCGS.
Compliance with the Order requirement date (of spring 2015 refueling outage) would require WCNOC to revise the WCGS strategies for core cooling (RCS inventory control) from 10 gpm to 40 gpm of boration/makeup. This would require additional analytical work and has a high potential for changing modifications that are currently planned for refueling outage 20 (spring 2015). Relaxation provides additional time to resolve industry issues and fully design and safely implement the next generation SHIELD seals. Additionally, the new seals will provide added safety margin during a BDBEE.
Condensate Storage Tank Based on the complex analysis, design, lead time for materials and construction time for the modification to meet seismic requirements of ESEP and missile protection of NEI 12-06 full implementation of the mitigation strategies in accordance with NRC Order EA-12-049 would not be completed by the Order requirement date. The current required implementation date is completion of the spring 2015 refueling outage. An extension of one additional refueling cycle is requested which would move the implementation date to completion of the fall 2016 refueling outage, which is still within the maximum allowed timeframe of December 2016.
Attachment to WO 14-0023 Page 3 of 3 Conclusion The WCGS FLEX strategies rely on the low leakage RCP seals and a seismic and missile protected CST. As described above, compliance with the current NRC Order EA-12-049 schedule requirement for full completion of implementation of mitigation strategies would result in hardship or unusual difficulty without a compensating increase in the level of safety.
Therefore, in accordance with the provisions of Section IV of the Order, WCNOC requests relaxation of the requirement described in Section IV.A.2, as explained above.
References
- 1. Letter from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," March 12, 2012. ADAMS Accession No. MLI12054A735.
- 2. WCNOC letter WO 13-0014, "Wolf Creek Nuclear Operating Corporation Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," February 28, 2013. ADAMS Accession No. ML13070A026.