NRR-PMDAPEm Resource From: Beltz, Terry Sent: Wednesday, February 05, 2014 6:25 AM To: 'Millen, Michael' Cc: 'harv.hanneman@nexteraenergy.com'; Carlson, Robert; Audrain, Margaret

Subject:

Point Beach Nuclear Plant, Unit 2 - Acceptance Review for Relief Request 2-RR-7: Re-Categorization of Unit 2 Steam Generator Nozzle to Safe-End Welds (TAC No. MF3304)

Dear Mr. Millen:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated December 27, 2013 (Agencywide Documents Access and Management System Package Accession No. ML13365A310), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted a relief request (2-RR-7) for the Point Beach Nuclear Plant (PBNP), Unit 2. NextEra requests that the NRC allow the re-categorization of the four steam generator nozzle dissimilar metal welds installed at PBNP, Unit 2. NextEra requests that the affected welds be re-categorized pursuant to conditions specified in 10 CFR 50.55a(g)(6)(ii)(F) for Class 1 piping and nozzle dissimilar-metal butt welds.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Please dont hesitate to contact me if you have any questions.

Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 (301) 415-3049 Terry.Beltz@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 1093 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D0146C5F12603)

Subject:

Point Beach Nuclear Plant, Unit 2 - Acceptance Review for Relief Request 2-RR-7: Re-Categorization of Unit 2 Steam Generator Nozzle to Safe-End Welds (TAC No. MF3304)

Sent Date: 2/5/2014 6:25:18 AM Received Date: 2/5/2014 6:24:37 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

"'harv.hanneman@nexteraenergy.com'" <harv.hanneman@nexteraenergy.com>

Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov>

Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>

Tracking Status: None

"'Millen, Michael'" <Michael.Millen@nexteraenergy.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1805 2/5/2014 6:24:37 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: