ML14015A278
| ML14015A278 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/21/2013 |
| From: | Walton R NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Shared Package | |
| ML11355A021 | List: |
| References | |
| Download: ML14015A278 (5) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Dresden Units 2 and 3 Date of Examination: October 21, 2013 Examination Level: RO SRO Operating Test Number: 2013-301 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations 2.1.25 N, S Determine Generator operating limits from Capability Curve.
Conduct of Operations 2.1.26 N, R Calculate stay time for work in high temperature area.
Equipment Control 2.2.14 N, R Perform APRM Calibration Surveillance.
Radiation Control N/A Emergency Procedures/Plan 2.4.27 N, R Perform actions related to a Fire in the Plant.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Dresden Units 2 and 3 Date of Examination: October 2013 Examination Level: RO SRO Operating Test Number:
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations 2.1.1 D, R Reportability Determination Conduct of Operations 2.1.5 N, R Authorize a Waiver for 10CFR Work Hour Limits Equipment Control 2.2.12 D, R Declare EDG Operable After Surveillance Review Radiation Control 2.3.4 D, R Select Personnel for Radiation Work Emergency Procedures/Plan 2.4.40 P, D, R Authorize Use of KI (2011 Exam)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Units 2 and 3 Date of Examination: October 2013 Exam Level: RO SRO-I SRO-U Operating Test No.: 2013301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. 211000 SBLC - Injection with Pump and RWCU Failures A, D, EN, S 1
- b. 209001 Core Spray - Perform Pump Test with Pump Trip A, D, L, P, S 2
- c. 239001 Main Steam - Unisolate a Line using Alternate Method D, P, S 3
- d. 207000 Iso Cond - Startup with Failure of the M/U System A, D, S 4
- e. 219000 Start Torus Cooling with Initiation Signal Present (LPCI),
LPCI NOT injecting into the Vessel L, N, S 5
- f. 264000 Perform Diesel Generator Full Load Reject Testing M, S 6
- g. 215002 Clear Rod Block Monitor Malfunction N, S 7
- h. 261000 SBGT - Post Maintenance Testing, with Auto Initiation A, D, L, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 295031 Line Up Reactor Head Cooling for Alternate Water Injection D, E, L, R 2
- j. 207000 Iso Cond - Valve in Local Sightglass D, E, L, R 4
- k. 2.1.30 Service Water - Reverse Service Water Flow Through X-Area Coolers D, E, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Units 2 and 3 Date of Examination: October 2013 Exam Level: RO SRO-I SRO-U Operating Test No.:
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. 211000 SBLC - Injection with Pump and RWCU Failures A, D, EN, S 1
- b. 209001 Core Spray - Perform Pump Test with Pump Trip A, D, L, P, S 2
- c. N/A
- d. 207000 Iso Cond - Startup with Failure of the M/U System A, D, S 4
- e. 219000 Start Torus Cooling with Initiation Signal Present (LPCI),
LPCI NOT injecting into the Vessel L, N, S 5
- f. 264000 Perform Diesel Generator Full Load Reject Testing M, S 6
- g. 215002 Clear Rod Block Monitor Malfunction N, S 7
- h. 261000 SBGT - Post Maintenance Testing, with Auto Initiation A, D, L, S 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 295031 Line Up Reactor Head Cooling for Alternate Water Injection D, E, L, R 2
- j. 207000 Iso Cond - Valve in Local Sightglass D, E, L, R 4
- k. 2.1.30 Service Water - Reverse Service Water Flow Through X-Area Coolers D, E, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Units 2 and 3 Date of Examination: October 2013 Exam Level: RO SRO-I SRO-U Operating Test No.:
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. 211000 SBLC - Injection with Pump and RWCU Failures A, EN, D, S 1
- b. N/A
- c. N/A
- d. 207000 Iso Cond - Startup with Failure of the M/U System A, D, S 4
- e. 219000 Start Torus Cooling with Initiation Signal Present (LPCI),
LPCI NOT injecting into the Vessel L, N, S 5
- f. N/A
- g. N/A
- h. N/A In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. 295031 Line Up Reactor Head Cooling for Alternate Water Injection D, E, L, R 2
- j. N/A
- k. 2.1.30 Service Water - Reverse Service Water Flow Through X-Area Coolers D, E, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1