SOUTHERN CALIFORNIA iED ISONI An EDISON INTERNATIONAL Company Richard St. Onge Director, Nuclear Regulatory Affairs and Emergency Planning I
SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1) 10 CFR 2.390(d)(1)
January 02, 2014 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Commitment-Change Report San Onofre Nuclear Generating Station Units 2 and 3
Dear Sir or Madam:
This letter transmits a report on changes to Southern California Edison (SCE) commitments for implementation of the mitigating strategies :required by Commission Order EA-02-026 Section B.5.b and subsequently incorporated as License Nos. NPF-10 Mitigating Strategy License Condition C(26) and NPF-1 5 Mitigating Strategy License Condition C(27). These commitment changes were made per Nuclear Energy Institute (NEI) "Guidelines for Managing NRC Commitment Changes;" NEI 99-04, Revision 0.
The Enclosure to this letter contains Security Related Information. SCE requests that the Enclosure be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).
This letter contains revised commitments as described in the Enclosure.
If you would like any additional information, please contact Mr. Ryan G. Pettus at (949) 368-89315.
Sincerely, SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Decontrolled when separated from Enclosure P.O. Box 128 San Clemente, CA 92674 V b I
ýýKK
SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Document Control Desk January 2, 2014
Enclosure:
Report on B.5.b Commitment Changes, December 24, 2013 cc:
D. Broaddus, Chief Plant Licensing IV-2 and Decommissioning Transition BranchG.
C. Gratton, NRC Project Manager, San Onofre Units 2 and 3 G. Wamick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Decontrolled when separated from Enclosure
SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Report on B.5.b Commitment Changes San Onofre Nuclear Generating Station, Units 2 and 3 December 24, 2013 SECURITY RELATED INFORMATION Page 1 of 14 Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
NOTE: This page decontrolled when separated from Attachments 1, 2 and 3
SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Report on B.5.b Commitment Changes December 24, 2013
References:
- 1. Letter from A. E. Scherer (SCE) to Document Control Desk (NRC), subject:
"Response Providing Information Regarding Implementation Details for the B.5.b Phases 2 and 3 Mitigation Strategies, including Responses to Requests for Additional Information," dated January 10, 2007.
- 2. Letter from Richard St. Onge (SCE) to Document Control Desk (NRC), subject:
"Commitment Change Report, San Onofre Nuclear Generating Station Units 2 and 3", dated September 03, 2013
- 3. Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC), subject:
"Notification of Permanent Cessation of Power Operations, San Onofre Nuclear Generating Station, Units 2 and 3", dated June 12, 2013
- 4. Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC), subject:
"Permanent Removal of Fuel form the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 3", dated June 28, 2013
- 5. Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC), subject:
"Permanent Removal of Fuel form the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 2", dated July 22, 2013 of Reference 1 provided SCE's commitments for implementation of the Phase 2 and 3 mitigating strategies for B.5.b.
The Enclosure provided in Reference 2 provided a summary of commitment changes for implementation of the Phase 2 and 3 mitigating strategies for B.5.b. following the permanent shutdown and defueling of the San Onofre Nuclear Generating Station Unit 3 and Unit 2 (per References 3, 4 and 5, respectively).
Further assessment of the Phase 2 and 3 mitigating strategies commitments for B.5.b proved the need to remove certain job/position descriptions and equipment descriptions.
These description changes are required due to the staffing changes following the permanent shutdown of the San Onofre Nuclear Generating Station and are not changes to the overall B.5.b strategy. A summary of the changes to these commitments and the evaluation per Nuclear Energy Institute (NEI) "Guidelines for Managing NRC Commitment Changes," NEI-99-04, Revision 0 is provided in the following attachments to this
Enclosure:
Attachment I SFP strategies described in Tables A.2-1 through A.2-6 PWR strategies described in Tables A4-1 through A.4-7 SECURITY RELATED INFORMATION Page 2 of 14 Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
NOTE: This page decontrolled when separated from Attachments 1, 2 and 3
SECURITY RELATED INFORMATION Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
Report on B.5.b Commitment Changes December 24, 2013 SFP Strategies Described in Tables A.2-1 through A.2-6 SECURITY RELATED INFORMATION Page 3 of 14 Withhold From Public Disclosure In Accordance With 10 CFR 2.390(d)(1)
NOTE: This page decontrolled when separated from Attachments 1, 2 and 3