Comments on Necessary Schedule for Commission Action Re Util Capability to Meet Terms Set by Puc of Ca,Per 840711 Request.Util Characterization of Schedules Reasonable
ML13333B177
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/15/1984
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Palladino
NRC COMMISSION (OCM)
Shared Package
ML13333B178 List:
References
NUDOCS 8411260027
Download: ML13333B177 (4)


Text

-UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NOV 15 1984 MEMORANDUM FOR: Chairman Palladino FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DECISION REGARDING RESTART OF SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 1 T in response to your request of November 7, 1984, provided below are staff views on the necessary schedule for Commission action with respect to Southern California Edison Company's (SCE) capability to meet the terms set by the California Public Utilities Commission.

The PUC decision, issued on May 2, 1984, established the following requirements:

a) Return-San Onofre 1 to full service by January 1, 1985 or begin toaccrue liability up to a maximum equal to the revenues collected on San Onofre 1 for 1984.

b) Full service is defined as either "200 consecutive hours at 90%

of capacity or 30 days continuing operation at-65% of capacity."

Under the first alternative to achieve full service, the plant wou1d have to run at 90% capacity from about December 23, 1984 to January 1, 1985.

Realistically, power generation would have to begin well before that to ensure no interruptions occur during the power run.

Under the second option, Unit 1 would have to be generating electricity by December 2, 1984 and maintain an average capacity of 65% for the month.

Prior to reaching full power, there are startup tests that must be performed after criticality is achieved, including physics tests and heat balances.

The staff estimates that this process, from criticality to full power operation, would take approximately two weeks.

Contact:

E. McKenna, NRR x27 468 8411260027 841115 PDR COMMS NRCC CORRESPONDENCE PDR

00 Chairman Palladino 2

Based on these considerations, the staff agrees that the SCE's characterization of the schedules involved are reasonable and that prompt Commission action would be necessary if SCE is to satisfy the conditions set by the PUC.

S1gned) Jack W. Roe William J. Dircks Executive Director for Operations cc:

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech SECY OPE OGC ACRS DISTRIBUTION Docket 50-206 NRC PDR w/inc6ming L PDR w/incoming EDO #000104 EDO Reading WDircks ECase/HDenton EMcKenna CJamerson ORB#5 Rdg. #000104 MJambor #000104 OELD LBerry #000104 JRoe TRehm VStello GCunningham RDeYoung Martin, RV KBowman #000104

  • SEE PREVIOUS PAGE FOR CONCURRENCE DL: SEPB*

DL: SEPB*

DL:AD/SA*

DL*

NR EDO EMcKenna:jb CGrimes DCrutchfield DEisenhut H

n WDircks 11/09/84 11/09/84 11/09/84 11/13/84 1 /

84

/

/84

Chairman Palladino

- 2 Based on these considerations, the staff agrees that the SCE's characterization of the schedules involved are reasonable and that prompt Commission action would be necessary if SCE is to satisfy the conditions set by the PUC.

(SinedJac W.Roe William Dircks, Executive Director for Operations cc:

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech SECY OPE OGC ACRS DISTRIBUTION Docket 50-206 NRC PDR w/incoming L PDR w/incoming EDO #000104 EDO Reading WDircks ECase/HDenton EMcKenna CJamerson ORB#5 Rdg. #000104 MJambor #000104 OELD LBerry #000104 JRoe TRehm VStello GCunningham RDeYoung Martin, RV KBowman #000104 SEPBjRM SEPB DL D E NRR EDO EMcKenna:jb CGrimes DC tc ield D

HDenton WDircks

/ ?/

/84 ll

/84 f /

/84 A./84

/

/84

/

/84

  • K.*

0P UNITED STATES 0

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 EDO PRINCIPAL CORRESPONDENCE CONTROL FROM:

DUE: 11/14/84 EDO CONTROL: 000104 DOC DT: 11/07/84 CHAIRMAN PALLADINO FINAL REPLY:

TO:

COMMISSIONERS FOR SIGNATURE OF:

M* PRIORITY w SECY NO:

EXECUTIVE DIRECTOR DESC:

ROUTING:

RESTART OF SAN ONOFRE 1 -

REQ VIEW ON STATEMENT DIRCKS MADE BY SOUTHERN CALIF.

EDISON REP.

THAT COMM.

ROE NEEDS TO MAKE A DECISION BY WEEK ENDING 11/11/84 REHM IF SEC IS TO SATISFY CONDITIONS SET BY THE CA PUC STELLO GCIJNN INGHAM (7SIGNED TO: NRR DATE: 11/07/84 DEYOUNG CONTACT:

DENTON MARTIN RV SPECIAL INSTRUCTIDONS OR REMARKS:

Received NRR:

11/8/84 contact:

Eisenhut cc:

Case/Denton P

PAS 7RJE REH