ML13333A470
| ML13333A470 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/01/1980 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | James Drake Southern California Edison Co |
| References | |
| TASK-03-06, TASK-3-6, TASK-RR NUDOCS 8001210301 | |
| Download: ML13333A470 (7) | |
Text
Docket No. 50-Z06 JANUARY
, 1 1980 Mr. James H. Drake Vice President Southern California Edison Commpany 2244 Walnut Grove Avenue Rosemead, California 91770
Dear Mr. Drake:
(
Recent seismic design evaluations conducted in the Systematic Evaluation Program (SEP) have indicated a potential safety concern relative to the anchorage and support of safety relatea electrical equipment.
It has also been observed 'that non-seismic Category I auxiliary items (dolleys, gas bottles, etc.) may be dislodged by an earthquake and damage safety related equipment.
These issues were identified during site visits to Dresden 2, Haddam Neck, Ginna, Oyster Creek, Palisades and Millstone I by review teams consisting of NRC representatives and consultants. Since operability of the subject equipment may be essential during and after a seismic disturbance, we request that you assess the capability of all safety related electrical equipment (as well as non-seismic Category I auxiliary items) to resist seismic forces and implement remedial measures, as necessary, to increase safety margins. All operating licensees of nuclear power facilities are being notified of this issue by an I&E Information Notice (Enclosure 1).
Within 30 days, you are requested to develop an action plan for resolution of this issue and to submit it for our review. The following issues should be addressed:
- 1.
Does positive anchorage exist (loaa carrying mechanism other than friction);
- 2. If positive anchorage exists, has the anchorage system been engineered with adequate capacity; and
- 3.
Was the anchorage fabricated to quality standards?
The results of your investigation of Item 1 should be submitted within 60 days of the date this letter is received.
it should describe any corrective action considered necessary.
The overall issue, including any required modifications, should be resolved by September 1, 1980.
SRAEO.
...............3f 1
0 1111
)A E
SURNAME 8
011030 DATE NRC FORM 318 (9-76)
NRCM 0240
- u.
- s. GoVERNMENT PRINTING OFFICEs 1976 - 626*624
A-1*
-2 Although the final seismic design basis for your facility has not been resolved, and other changes may be required, appropriate action on this matter should not be delayed. If necessary, consideration should be given to providing temporary supports with more permanent supports being installed afterall seismic questions have been resolved.
Sincerely, P0rigina':
.e by LDarrell G. Eisenbua Darrell G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/enclosure:
See next page DISTRIBUTION:
Docket SEPB Reading ORB #2 Reading NRC PDR Local PDR TERA DEisenhut RVollmer DZiemann Project Manager HSmith DCrutchfield HLevin CHofmayer Attorney, OELD NSIC ACRS (16)
DOR:A/DIR DGEisenhut OFFICE,-DOR.:SERB.......DOR:S.EP
....DOR
/
.C DOR.:. RB.#2 R R
...... DDR:0RB..#2/C.DO
/SEP SURNAME..
in;rd....CHofmay 5A DCrl....
ld PO'Connor DLZiemann R
er DATE N1M 024 S
E T
NRC FORM 318 (9-76) NRCM 0240
- U.S.
GOVERNMENT PRI TING OFFICE: 1979-289-369
(KpjR REGUI 0
UNITED STATES NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20555 January 1, 1980 Docket No. 50-206 Mr. James H. Drake Vice President Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, California 91770
Dear Mr. Drake:
Recent seismic design evaluations conducted in the Systematic Evaluation Program (SEP) have indicated a potential safety concern relative to the anchorage and support of safety related electrical equipment. It has also been observed that non-seismic Category I auxiliary items (dolleys, gas bottles, etc.) may be dislodged by an earthquake and damage safety related equipment. These issues were identified during site visits to Dresden 2, Haddam Neck, Ginna, Oyster Creek, Palisades and Millstone 1 by review teams consisting of NRC representatives and consultants. Since operability of the subject equipment may be essential during and after a seismic disturbance, we request that you assess the capability of all safety related electrical equipment (as well as non-seismic Category I auxiliary items) to resist seismic forces and implement remedial measures, as necessary, to increase safety margins. All operating licensees of nuclear power facilities are being notified of this issue by an I&E Information Notice (Enclosure 1).
Within 30 days, you are requested to develop an action plan for resolution of this issue and to submit it for our review. The following issues should be addressed:
- 1. Does positive anchorage exist (load carrying mechanism other than friction);
- 2. If positive anchorage exists, has the anchorage system been engineered with adequate capacity; and
- 3. Was the anchorage fabricated to quality standards?
The results of your investigation of Item 1 should be submitted within 60 days of the date this letter is received. It should describe any corrective action considered necessary. The overall issue, including any required modifications, should be resolved by September 1, 1980.
-2 Although the final seismic desigp basis for your facility has not been resolved, and other changes may be required, appropriate action on this matter should not be delayed. If necessary, consideration should be given to providing temporary supports with more permanent supports being installed after all seismic questions have been resolved.
$incerely, arTT G.I Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/enclosure:
See next page
-3 CC w/enclosure:
Charles R. Kocher, Assistant Director, Technical Assessment General Counsel Division Southern California Edison Company Office of Radiation Programs Post Office Box 800 (AW-459)
Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Crystal Mall #2 Samuel B. Casey Arlington, Virginia 20460 Chickering & Gregory Three Embarcadero Center U. S. Environmental Protection Twenty-Third Floor Agency San Francisco, California 94111 Region IX Office ATTN:
EIS COORDINATOR Jack E. Thomas 215 Freemont Street Harry B. Stoehr San Francisco, California 94111 San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 U. S. Nuclear Regulatory Commission ATTN:
Robert J. Pate P. 0. Box 4167 San Clemente, California 92672 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:
Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street,F Room 498 Sacramento, California 95814 Chairman--
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 2055b NOVEMBER
, 1979 IE Information Notice No. 79 ANCHORAGE AND SUPPORT OF SAFETY RELATED ELECTRICAL EQUIPMENT Description of Circumstances Recent seismic design evaluations in connection with the NRC Systematic Evaluation Program (SEP) have indicated a potential safety deficiency relative to the anchorage and support of safety related electrical equip ment. This subject was highlighted for more in-depth evaluation after site visits to several facilities. These reviews have indicated that equipment is supported in a non-uniform manner. This may have resulted from the fact that earlier engineering design criteria did not require rigorous analyses.
Further evaluations are continuing for the SEP plant designs.
In some cases, design mooifications may be required to render acceptable seismic design margins.
In general, a lack of engineered supports of safety related electrical equip ment has been observed at certain SEP plants. Typical components affected include:
-AC and DC motor control centers
-transformers
-switch gear
-inverters
-control room panels
-battery racks
-instrument panels
-cable trays Also, a related observation indicates that non-seismic Category I ancillary items (dolleys, gas bottles, block and tackle gear, ductwork, etc.) are located such that they may dislodge, impact and damage safety related equipment during an earthquake.
The types of anchorage systems utilized in these plants and their expected capacities vary widely.
For example, high uncertainty exists relative to the capacity of non-engineered tack welds and attachments that rely on frictional clamping-forces.-i-som-eases,-equipmenthas been found free standing with no means of positive lateral support.
(Friction being the only lateral load carryng mechanism). Most often, heavier equipment is anchored using 1) tack welds to steel angles embedded in concrete; 2) clips that rely on frictional resistance; 3) concrete embedded anchor bolts; or
- 4) external braced frames. Lighter equipment housed in cabinets or attached to panels or racks has been anchored using 1) bolts; 2) sheet metal screws; 3) tack welds; and 4) braced racks.
-2 The potential concern is that certain pieces of equipment may not have adequate levels of seismic resistance capability due to limited anchorage capacity. The potential problems relate to overturning and/or sliding of large equipment and gross movement or unacceptable forces on smaller attached equipment that may render it inoperable during an earthquake.
For certain large battery racks, this judgement is supported by computations that predict unacceptable seismic behavior.
Section 3.10 Df the Standard Review Plan provides acceptance criteria for the seismic qualification of Category I electrical equipment. These criteria include IEEE Std. 344, "Guide for Seismic Qualification of Class 1 Electrical Equipment for Nuclear Power Generating Stations", first issued in 1971.
Facili ties designed before about 1971 without benefit of such design and testing criteria may have some anchorage deficiencies.
The NRC staff is continuing to evaluate this issue on the SEP plants as part of the seismic review in the SEP. Remedial action has been taken on one SEP plant to date.
This Information Notice is provided as an early notification of a possible significant matter. It is expected that recipients will review the design criteria for anchorage and support of safety related electrical equipment including as-built installation details to assure adequate capability to resist seismic forces.
No written response is required. If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.