ML13331B330

From kanterella
Jump to navigation Jump to search
Forwards Apr 1991 Monthly Operating Rept & Revised Operating Status for Mar 1991
ML13331B330
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/15/1991
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML13331B331 List:
References
NUDOCS 9105300042
Download: ML13331B330 (1)


Text

Southern California Edison Company 23 PARKER STREET IRVINE, CALIFORNIA 92718 F. R. NANDY TELEPHONE MANAGER, NUCLEAR LICENSING May 15, 1991 714) 454-4504 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket No. 50-206 Monthly Operating Report for April 1991 San Onofre Nuclear Generating Station, Unit 1 Technical Specification 6.9.1.10 to Provisional Operating License DPR-13 for the San Onofre Nuclear Generating Station, Unit 1, requires SCE provide a Monthly Operating Report which includes routine operating statistics, shutdown experience, all challenges to pressurizer safety and relief valves.

This letter transmits the April 1991 Monthly Operating Report for Unit 1.

During this reporting period, one Power Operated Relief Valve (PORV) was challanged on April 11, 1991. A brief summary is enclosed in Attachment A.

Attachment B provides a revised Unit 1 "Operating Status" sheet for the March 1991 Monthly Operating Report to correct a typographical error. The effected portion of the sheet is appropriately noted.

Attachment C provides a revised Unit 1 "Unit Shutdowns and Power Reductions" sheet for the March 1991 Monthly Operating Report to correctly reflect the number of outages.

If you require any additional information, please let me know.

Very truly yours, Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3)

G. Kalman (NRR, SONGS Project Manager)

Institute of Nuclear Power Operations (INPO) 9105300042 910515 PDR ADOCK 05000206.

R PDR