ML13331B224
| ML13331B224 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/31/1989 |
| From: | SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML13331B222 | List: |
| References | |
| NUDOCS 8911090080 | |
| Download: ML13331B224 (2) | |
Text
ATTACHMENT 2 PROPOSED LICENSE CONDITION
~ ~ ~
39 1C)31 K~IR PDCK 500Q
E.
Steam Generator Inspections Southern California Edison shall perform an inspection of the steam generators during the thermal shield outage scheduled to begin no later than June 30, 1990.
This represents a one-time exemption from the inspection interval requirements as delineated in Technical Specification 4.16, "Inservice Inspection of Steam Generator Tubing".
F.
Deleted G.
Physical Protection SCE shall fully implement and maintain in effect all provisions of the Commi ss ion -approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authorit y of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled:
"San Onofre Nuclear Generating Station, Units 1, 2, and 3 Physical Security Plan," with revisions submitted through April 22, 1988; "San Onofre Nuclear Generating Station, Units 1, 2, and 3 Security Force Training and Qualification Plan," with revisions submitted through October 22, 1986; and "San Onofre Nuclear Generating Station, Units 1, 2, and 3, Safeguards Contingency Plan,"
with revisions submitted through December 29, 1987. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
SAN ONOFRE -UNIT 1
Revised: