Discusses Util 900131 Response to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Preloaded.... Review of All safety-related Check Valves Requested within 90 Days
ML13331A375
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/12/1990
From: Tatum J
Office of Nuclear Reactor Regulation
To: Ray H
Southern California Edison Co
References
TAC-74307 IEB-89-002, IEB-89-2, NUDOCS 9003190295
Download: ML13331A375 (3)


Text

MA0M 12, 1990 Docket No. 50-206 DISTRIBUTION Docket File T. McLellan NRC & LPDRs C. Sellers PD5 Reading H. Rood Mr. Harold B. Ray C. Trammell (2)

L. Kokajko Vice President P. Shea R. Hermann Southern California Edison Company OGC J. Tatum (2)

Irvine Operations Center PD5 Plant File ACRS (10) 23 Parker E. Jordan J. Zwolinski Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

RESPONSE TO NRC BULLETIN 89-02 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 (TAC NO. 74307)

By letter dated January 31, 1990, you provided your response to NRC Bulletin 89-02, "Stress Corrosion Cracking of Hiqh-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor-Darling Model S350W Swing Check Valves or Valves of Similar Design." In your response, you stated that only safety related check valves in the In-Service Testing (IST) program were evaluated relative to the concern expressed by the generic letter.

Although your logic for excluding other safety related check valves may have some merit, the bulletin requested that you review all safety related check valves. Since we have not specifically reviewed your methodology for excluding certain safety related check valves from the IST program, we request that you complete the actions required by the bulletin for all safety related check valves. You are requested to provide your response in accordance with the requirements set forth by the bulletin, except that the letter of confir mation discussed in Item 1 of the Reporting Requirements should be submitted within 90 days of your receipt of this letter.

The reporting and/or recordkeepinq requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.

Please contact us if you should have any questions regarding this request.

Sincerely, original signed by James E. Tatum James E. Tatum, Project Manager Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DRSP/PD5 P/PD5

/SP/PD5 PShea

)

num:sq cmmell:

31 / 0 F//90 3/( /90 OFFICIAL RECORD COPY

[DOCUMENT NAME]

90o3190295 900312 r

t F*DR ADOCK 05000206(

C)

PDC

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 12, 1990 Docket No. 50-206 Mr. Harold B. Ray Vice President Southern California Edison Company Irvine Operations Center 23 Parker Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

RESPONSE TO NRC BULLETIN 89-02 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 (TAC NO. 74307)

By letter dated January 31, 1990, you provided your response to NRC Bulletin 89-02, "Stress Corrosion Crackinq of Hiqh-Hardness Type 410 Stainless Steel Internal Preloaded Boltinq in Anchor-Darlinq Model S350W Swinq Check Valves or Valves of Similar Desiqn." In your response, you stated that only safety related check valves in the In-Service Testinq (IST) proqram were evaluated relative to the concern expressed by the qeneric letter.

Althouqh your loqic for excludinq other safety related check valves may have some merit, the bulletin requested that you review all safety related check valves. Since we have not specifically reviewed your methodoloqy for excludinq certain safety related check valves from the IST proqram, we request that you complete the actions required by the bulletin for all safety related check valves. You are requested to provide your response in accordance with the requirements set forth by the bulletin, except that the letter of confir mation discussed in Item 1 of the Reportinq Requirements should be submitted within 90 days of your receipt of this letter.

The reportinq and/or recordkeepinq requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.

Please contact us if you should have any questions reqardinq this request.

Sincerely, mes E. Tatum, Project Manaqer roject Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Requlation cc:

See next paqe

9 Mr. Harold B. Pay San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc David R. Piqott Mr. Richard J. Kosiba, Project Manager Orrick, Herrington & Sutcliffe Bechtel Power Corporation 600 Montqomery Street 12440 E. Imperial Highway San Francisco, California 94111 Norwalk, California 90650 Mr. Robert G. Lacy Mr. Phil Johnson Manager, Nuclear U.S. Nuclear Requaltory Commission San Dieqo Gas & Electric Company Region V P. 0. Box 1831 1450 Maria Lane, Suite 210 San Diego, California 92112 Walnut Creek, California 94596 Resident Inspector/San Onofre NPS U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego 1600 Pacific Highway. Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. Nuclear Reculatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Management Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don Womeldorf Chief Environmental Management California Department of Health 714 P Street, Room 616 Sacramento, California 95814