Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING August 3, 1988 (818) 302-1749 AND LICENSING U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Licensing Actions San Onofre Nuclear Generating Station Unit 1 By letter dated June 7, 1988, a prioritized list of significant licensing actions for San Onofre Unit 1 was provided to the NRC. The purpose of this letter is to provide an update of the list. The enclosure provides the updated list with the revised priorities and changes.
All changes are indicated by change bars.
If you have any questions regarding this matter, please let me know.
Very truly yours, M. 0. Medford Manager of Nuclear Engineering and Licensing ACL:0068n Enclosure cc: J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 bcc: (See attached sheet) 880-80)90275 880803 PDR ADOCK 05000206 P
Prioritized List of Significant San Onofre Unit 1 Licensing Actions August 1988 SCE Submittal Federal Register Approval Required1 Issue Dates Status Date Remarks
- 1. Nuclear 4/15/88 Noticed 5/11/88 10/14/88*
Instrumentation System Tech Specs (Am't. 150)
- 2. Spent Fuel 4/28/88 Noticed 6/20/88 ASAP prior to Transshipment 6/10/88 10/14/88*
License Amendment (Am't. 148)
- 3. Administrative Tech 8/27/87 Notice Required NA Specs including QA Audits (Am't 145)
- 4. Control Rod 5/26/88 Notice Required 1/13/89**
Insertion Limits (Am't. 151)
- 5. Fire Protection 12/17/85 Notice Required NA Based on mtg.
Tech Specs 5/19/86 of 3/22/88 (Am'ts 120 & 136) proposed Tech Spec to be revised.
Submittal scheduled for 9/16/88
- 6. Steam Generator 3/10/88 Notice Required 1/13/89**
Interim Tech Tube Plugging 3/22/88 Spec issued Criteria (F*) Tech 3/29/88 5/6/88 Spec --
long term (Am't 149)
- 7. Core Related 8/31/87 Notice Required NA Tech Specs (Am't. 143)
- Prior to Cycle 10 refueling outage Prior to end of Cycle 10 refueling outage
- 1. NA indicates plant operation is not contingent on approval.