ML13330A787

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Action Required
ML13330A787
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/02/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7911190201
Download: ML13330A787 (1)


Text

'R, REG",.

/e UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA

'/

4 4WALNUT CREEK, CALIFORNIA 94596 November 2, 1979 Docket No. 50-206 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Mr. A. Arenal, Vice President Advanced Engineering Gentlemen:

Enclosed is IE Bulletin No. 79-25 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, R. H. Engelke W=---

Director

Enclosures:

1. IE Bulletin No. 79-25
2. List of IE Bulletins Issued in the Last Six Months cc w/enclosures:

J. M. Curran, SCE J. T. Head, SCE e1 o To,,

79190 2OC)