ML13330A786

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Response Required
ML13330A786
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/29/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7911150471
Download: ML13330A786 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD SUITE 202, WNALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 October 29, 1979 Docket No. 50-205 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Mr. A. Arenal, Vice President Advanced Engineering Gentlemen:

The enclosed Bulletin No. 79-17, Revision 1 is forwarded to you for action. A written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely, R. H. Engelken Director

Enclosure:

IE Bulletin No. 79-17, Revision 1 cc w/enclosure:

J. M. Curran, SCE J. T. Head, SCE 7911150