ML13330A784

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Action Required
ML13330A784
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/17/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7910310272
Download: ML13330A784 (1)


Text

8RE~,

a 44UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD 4 ~4 SUITE 202, WALNUT CREEK PLAZA pk~tyWALNUT CREEK, CALIFORNIA 94596 October -17, 1979 Docket No. 50-206 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. A. Arenal, Vice President Advanced Engineering Gentlemen:

Enclosed is IE Bulletin No. 79-13, Revision 2 which requires action by you with regard to your power reactor facility(ies).

Should you have any questions regarding this Bulletin or the actions re quired by you, please contact this office.

Sincerely, R. H. Engelken Director

Enclosures:

1. IE Bulletin No. 79-13, Revision 2
2. List of IE Bulletins Issued in the Last Six Months cc w/enclosures:

J. M. Curran, SCE J. T. Head, SCE

)

7910310