ML13330A141

From kanterella
Jump to navigation Jump to search
Accepts Util Commitments to 791023, Interim Position on Containment Purging & Venting Pending Resolution of Isolation Valve Operability
ML13330A141
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/08/1980
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Dietch R
Southern California Edison Co
References
TASK-06-04, TASK-6-4, TASK-RR NUDOCS 8010310558
Download: ML13330A141 (3)


Text

DISTRIBUTION:

Docket HSmith NRC PDR EReeves Local PDR ORB 5 PM Docket No. 50-206 TERA OELD OCTOBER 1980 NSIC OI&E NRR Reading ACRS (16)

ORB #5 Reading Gray File Mr. R. Dietch DEisenhut Xtra Cy (6)

Vice President RPurple GLainas Nuclear Engineering and Operations JRoe JHeltemes Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Dear Mr. Dietch:

SUBJECT:

CONFIRMATION OF COMMITMENT TO STAFF'S OCTOBER 23, 1979 INTERIM POSITION ON CONTAINMENT PURGING AND VENTING (SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1)

We have completed our review of your submittals for your facility which provided your commitments to our October 23, 1979 "Interim Position on Containment Purging and Venting Pending Resolution of Isolation Valve Operability".

We find your commitments to the Interim Position acceptable and are to remain in effect pending completion of our long-term review.

You may receive additional staff guidance or questions as our long-term review continues.

At the conclusion of our long-term review, we will provide you with our Safety Evaluation and request Technical Specification changes if required..

A response to this confirmatory letter is not required.

Sincerely, Original signed by Dennis M. Crutchfield Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing cc:

See next page O DLR #5/LA DL:

/PM DL /

SURNAME..........

d

/~/80

/ /80

//80 mrCFoseo t~ as 7acuo024o GOVERNMENT PRINTING OFFICE: 1979-289-369.

X tp REG&4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 8, 1980 Docket No. 50-206 Mr. R. Dietch Vice President Nuclear Engineering and Operations Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Dear Mr. Dietch:

SUBJECT:

CONFIRMATION OF COMMITMENT TO STAFF'S OCTOBER 23, 1979 INTERIM POSITION ON CONTAINMENT PURGING AND VENTING (SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1)

We have completed our review of your submittals for your facility which provided your commitments to our October 23, 1979 "Interim Position on Containment Purging and Venting Pending Resolution of Isolation Valve Operability". We find your commitments to the Interim Position acceptable and are to remain in effect pending completion of our long-term review.

You may receive additional staff guidance or questions as our long-term review continues.

At the conclusion of our long-term review, we will provide you with our Safety Evaluation and request Technical Specification changes if required.

A response to this confirmatory letter is not required.

Sin erely, D'nnis M. Crutchfield, hief Operating Reactors Branch #5 Division of Licensing cc:

See next page Sol31097V

Mr. October 8, 1980 CC:

Charles R. Kocher, Assistant Director, Technical Assessment General Counsel Division Southern California Edison Company Office of Radiation Program Post Office Box 800 (AW-459)

Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Crystal Mall 02 SSamuel B. Casey Arlington, Virginia 20460 Chickering & Gregory Three Embarcadero Center U. S. Environmental Protection Twenty-Third Floor Agency San Francisco, California 94111 Region IX Office ATTN:

EIS COORDINATOR Jack E. Thomas 215 Freemont Street Harry B. Stoehr San Francisco, California 94111 San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector c/o U. S. NRC P. 0. Box AA Oceanside, California 92054 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814