DISTRIBUTION.
o DCrutchfield R"
Project Manager Local PDR" HSmith TERA OELD, JMurray Docket No. 50-206 NSIC OI&E (3)
AUG 2 9 1980 NRR Reading BJones (4)
ORB #5 Reading BScharf (2)
Mr. R. Dietch HDenton OPA, CMiles Vice President ECase JBishop, OELD DEisenhut JHeltemes Nuclear Engineering and Operations DPise J~otems J*
Southern California Edison Company RPurple SNorris 2244 Walnut Grove Avenue Teovak Ay (161 Post Office Box 800 RTedesco Gray File Rosemead, California 91770 GLainas Xtra Cy (6)
R JO1shinski RDiggs RHartfield, MPA SECY GBennington, MPA.SfoUon
SUBJECT:
Environmental Qualification of Electrical Equipment (San Onofre Nuclear Generating Station, Unit 1).
This letter transmits an order which requires information to support the environmental qualification of safety related electrical equipment at San Onofre Nuclear Generating Station, Unit 1.
The Commission's Memorandum and Order of May 23, 1980 addresses safety related electrical equipment exposed to a harsh environment, inside or outside containment, resulting from an accident.
The Order requires that all such equipment in operating reactors be fully qualified by June 30, 1982.
To complete this objective, you are required to submit, by November 1, 1980, all information to support a safety evaluation of the aforemen tioned equipment. If your facility had an established commitment date before November 1, 1980, it is fully expected that your submittal will be not later than that commitment date. If your facility's.commitment date is past without a complete submittal, it is strongly recommended that actions be expedited since they have already impacted the staff review schedule.
Briefings were held with all interested licensees during the week of July 17, 1980. Enforcement actions relative to this Order were dis cussed during these briefings.
Sincerely, Dennis M. Crutchfield, Chief (D 9 OpertingReactors Branch #5 t
DviionofLicensing.4 RR: D/'I R NRR:DR' DE E
Ca~s He~I
-sss e0.,(3 Enr ncure-118
/
OFFICE DL:OR A...
.../.
R D
SRvcrHSA~S SNowi 1a Dn See next page 80 1J #t/80 1 2 0
/80 DATENC O
M 1.C 2
SP N
Dennis... M. Cr t hf e d Ch..
.ef.....
NRC ~ ~
~
~
~
~
~
~
~
~~prtn Reator Branc
- 571NCJ 20-,US OENMN RNIGOFC:17-8-6
pje 0
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 29, 1980 Docket No. 50-206 Mr. R. Dietch Vice President Nuclear Engineering and Operations Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770
Dear Mr. Dietch:
SUBJECT:
Environmental Qualification of Electrical Equi ment (San Onofre Nuclear Generating Station, Unit 1)
This letter transmits an order which requires information to support the environmental qualification of safety related electrical equipment at San Onofre Nuclear Generating Station, Unit 1.
The Commission's Memorandum and Order of May 23, 1980 addresses safety related electrical equipment exposed to a harsh environment, inside or outside containment, resulting from an accident. The Order requires that all such equipment in operating reactors be fully qualified by June 30, 1982.
To complete this objective, you are required to submit, by November 1, 1980, all information to support a safety evaluation of the aforemen tioned equipment. If your facility had an established commitment date before November 1, 1980, it is fully expected that your submittal will be not later than that commitment date. If your facility's commitment date is past without a complete submittal, it is strongly recommended that actions be expedited since they have already impacted the staff review schedule.
Briefings were held with all interested licensees during the week of July 17, 1980. Enforcement actions relative to this Order were dis cussed during these briefings.
Sin rely, Dennis M. Crutchfield, Chie Operating Reactors Branch #5 Division of Licensing
Enclosure:
Order cc:
See next page
Mr.
August 29, 1980 cc w/enclosure:
Charles R. Kocher, Assistant Director, Technical Assessment General Counsel Division Southern California Edison Company Office of Radiation Programs Post Office Box 800 (AW-459)
Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Crystal Mall #2 SSamuel B. Casey Arlington, Virginia 20460 Chickering & Gregory Three Embarcadero Center U. S. Environmental Protection Twenty-Third Floor Agency San Francisco, California 94111 Region IX Office ATTN:
EIS COORDINATOR Jack E. Thomas 215 Freemont Street Harry B. Stoehr San Francisco, California 94111 San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector c/o U. S. NRC P. 0. Box AA Oceanside, California 92054 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814