0. pj REGOUI,
0~
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
AUG 1 6 1993
Docket Nos. 50-206, 50-361, 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention: Mr. Harold B. Ray, Senior Vice President, Power Systems
SUBJECT: NRC MEETING REPORT NOS. 50-206/361/362/93-24
This refers to the management meeting held with Southern California Edison
Company (SCE) and NRC Region V management at the San Onofre Nuclear Generating
Station (SONGS) on July 29, 1993. The purpose of the meeting was to discuss
the new organization structure and senior management changes at SONGS, the
status of Unit 1, recent Units 2 and 3 steam generator issues, and recent
engineering and maintenance issues. Details of the meeting are described in
the enclosed Meeting Report.
Overall we found the meeting to be beneficial.
We recognize the efforts you
have taken in the steam generator tube inspection program and in keeping us
informed of the results of those inspections. We support your continued
efforts to closely monitor the steam generator leakage in Unit 3 and to be
watchful for any indications of a more significant concern. In addition, we
will continue to monitor the impact of the organizational changes discussed
during the meeting for improvement of overall station performance and
communications.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
. A.Va Denburgh,
Chief
Reactor Projects Branch
Enclosure:
Management Meeting Report Nos. 50-206/361/362/93-24
9309290168 930816
PDR ADOCK 05000206
a
2
cc w/enclosure:
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
James A. Beoletto, Esq., Southern California Edison Company
Chairman, Board of Supervisors, County of San Diego
Alan R. Watts, Esq., Rourke & Woodruff
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President and Site Manager, Southern California Edison
Company
Mr. Don J. Womeldorf, Chief, Environmental Management Branch
Mr. Richard J. Kosiba, Project Manager, Bechtel Power Corporation
Mr. Robert G. Lacy, San Diego Gas and Electric
Mr. Steve Hsu, Radiologic Health Branch
Mayor, City of San Clemente
3
bcc w/enclosure:
Project Inspector
Resident Inspector
Docket File
G. Cook
B. Faulkenberry
S. Richards
bcc w/o enclosure:
M. Smith
J. Zollicoffer
J. Bianchi
CRegan
HWong
Caa
urgh
KPe
s
ff/93
/
/1393
/ V93
/
93
[RE
T COPY ] RE
T COPY ] R
T COPY
RE ES COPY]
[ (ES INO
I XES / NO
1 -YES YNO
1 XES / 0
1
[SEND TO DCS]
NO]
[REQUEST COPY] [REQUEST COPY]
[ SEND TO PDR 1 YES
NO 1
[YES
/ NO I YHES
/
NO1
280069