Forwards Insp Repts 50-206/92-20,50-361/92-20 & 50-362/92-20 on 920604-0716 & Notice of Violation
ML13329A175
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/13/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13329A176 List:
References
NUDOCS 9208310298
Download: ML13329A175 (3)


See also: IR 05000206/1992020

Text

CIV

REG0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CAUFORNIA 94596-5368

AUG

3

Docket Nos. 50-206, 50-361, 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention:

Mr. Harold B. Ray, Senior Vice President, Nuclear

Gentlemen:

This refers to the routine inspection conducted by Messrs. C. W. Caldwell,

D. L. Solorio and C. D. Townsend of this office on June 4, 1992 through

July 16, 1992, of activities authorized by NRC License Nos. DPR-13, NPF-10 and

NPF-15, and to the discussion of our findings held by the inspectors with

Mr. H. E. Morgan and other members of the Southern California Edison staff at

the conclusion of the inspection.

Areas examined during the inspection are identified in the enclosed inspection

.report.

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel and observations by the inspector.

Based on the results of this inspection, one of your activities appeared to be

in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). This violation is an example of weakness in the interface

between Station Technical (STEC) and Operations in controlling plant equipment

configuration during performance of surveillance activities. Specifically,

Station Technical personnel did not obtain approval from the Senior Reactor

Operator (SRO) Operations Superintendent to perform an inservice test of a

Unit 2 auxiliary feedwater pump. As a result, the SRO was not involved to the

level required by both Operations and Engineering procedures.

A second instance of this weakness in the STEC/Operations interface was noted

in which a Unit 2 salt water cooling (SWC) pump became inoperable due to a

misaligned valve as detailed in licensee event report 2-92-009. In that case,

Operations personnel failed to recognize that an Engineering procedure did not

comply with station requirements to provide for an Operations sign-off and an

independent verification of equipment manipulation. Thus, proper

configuration control was not maintained.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific action taken and any additional

actions you plan to prevent recurrence. Also, please include your evaluation

of the adequacy of the interface between Station Technical and Operations to

.ensure

proper configuration control of equipment. After-reviewing your

response to this Notice, including your proposed corrective actions and the

9208310298 920813

PDR

ADOCK 05000206

G

PDR

results of future inspections, the NRC will determine whether further NRC

enforcement action is necessary to ensure compliance with NRC regulatory

requirements.

In accordance with 10 CFR 2.790, of the NRC's "Rules of Practice," a copy of

this letter, the enclosures, and your response will be placed in the NRC

Public Document Room.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

S. A. Richards, Chief

Reactor Projects Branch

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-206/92-20

50-361/92-20 and

50-362/92-20

cc w/Enclosures:

H. E. Morgan, Vice President and Site Manager (San Clemente)

R. Krieger, Station Manager (San Clemente)

State of California

bcc: J. Martin, RV

M. Fields, NRR

REGION V

TSundsmo

HWong

SRi chards

s

8/ (1//92

8/ t3 /92

8/( ? /92

8/

EST COPY

] EUEST COPY

]

EST COPY

]REQUEST COPY

]

YESES

/ NO

1ES / NO

1 YES /NO

RHuey

8// 5/92

EST COPY

]

YES

NO

]A)

SONGS<

CCaldwell

8/13 /92

EST COPY

]

YES)/ NO

SEN TO PDR

]

YES

NO