Forwards Corrected Pages for License DPR-13,Amend 42
ML13326A560
Person / Time
Site: San Onofre 
Issue date: 08/28/1979
From: Ziemann D
Office of Nuclear Reactor Regulation
To: James Drake
Southern California Edison Co
References
NUDOCS 7909270774
Download: ML13326A560 (7)


Text

(

Docket 50-20 DBrinkman AUG 2 8 1979 NR ACRS (16)

Local PDR OPA(CMiles)

ORB#2 RDG RDiggs NRR RDG HDenton Docket No. 50-206 DEisenhut GLear BGrimes JRBuchanan RVollmer TERA TCarter Mr. James H. Drake HSmith Vice President ABurger Southern California Edison Company OELD 2244 Walnut Grove Avenue OI&E(5)

Post Office Box 800 Bdones(4)

Rosemead, California 91770 BScharf(10)

Dear Mr. Drake:

During the issuance of Amendment No. 42, dated July 6, 1979, to Provisional Operating License No. DPR-13 for the San Onofre Nuclear Generating Station Unit 1, we inadvertently changed the Appendix B Technical Specification (ETS) 5.3.2.a, membership of the Nuclear Audit and Review Committee (page 5-5), instead of ETS 5.3.1.a, membership of the Onsite Review Committee (page 5-1). In addition, Figures 6.2.1.1 and 5.2-1, which were approved by Amendment No. 42, were unintentionally omitted. The enclosed pages correct these editorial and administrative.errors.

We regret any inconvenience these errors may have caused you.

Sincerely, Original Signed byli Dennis L. ZiemaRn Dennis L. Ziemann, Chief.

Operating Reactors Branch #2 Division of Operating Reactors

Enclosures:

1. Revised Instruction Sheet for Amendment No. 42
2. Pages 69, 5-1, 5-2, and 5-5 cc w/enclosures:

See next page

@FFIC.

DORIOQ 2

DOR:ORB#2 DOR:ORB#2

.UR-N.,

HSm sah ABurger DLZiemanO 270 o n -rC 8

9 8 / Z 3 / 7 8 /

8 7 9 N.

.7.

.7 MA2C FORM 318 (9-76) NRCH 0240 U.S. GOVEINMNua PR.N.IN oFFIS: 197s - ass - 7169

Mr. James August 28, 1979 cc Charles R. Kocher, Assistant Director, Technical Assessment General Counsel Division Southern California Edison Company Office of Radiation Programs Post Office Box 800 (AW-459 Rosemead, California 91770 U. S. Environmental Protection Agency David R. Pigott Crystal Mall #2 Samuel B. Casey Arlington, Virginia 20460 Chickering & Gregory Three Embarcadero Center U. S. Environmental Protection Twenty-Third Floor Agency San Francisco, California 94111 Region IX Office ATTN:

EIS COORDINATOR Jack E. Thomas 215 Freemont Street Harry B. Stoehr San Francisco, California 94111 San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 U. S. Nuclear Regulatory Commission ATTN:

Robert J. Pate P. 0. Box 4167 San Clemente, California 92672 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City ofo San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814

  • CORRECTION ATTACHMENT TO LICENSE AMENDMENT NO. 42 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications and Bases and Appendix B Technical Specifications by removing the following pages and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain vertical lines indicating the areas of change.

PAGES (Appendix A) 69 70 70a 73 (Appendix B) 5-1 5-2 5-3

  • Also reinstates page 5-5 (Appendix B),.as issued by License Amendment No. 39, which was inadvertently changed during the issuance of Amendment No. 42, dated July 6, 1979.

FIURE 6.2.1.1 ee OFFSIT-' OFaANI ZATION CHAIRMAN OF THE BOARD I

PRESIDENT SENIOR VICE PRESIDE I (FUEL SUPPLY (POWER SUPPLY)

(YTM.(NIERN AIACDCNM 11 PREVIDENTEVICE PESIDENT VICE PREIDEr VICE BOARD

-GENERAL UZA SUPERI ENDENT MANAGER OF MANAGER OF MANAGER OF C4I=

STEAM GENERATION ENVION,=AL ENGINEERING DESIGN AFFAIRS MANAGER OF GENERATION ENGINEERD&

f SERVICES STAFF~rR

MAGER, CIFOF CHIEF OF KANJI.ERF NUCLEAR GENERATION NUCLEAR DEVEPENT AND QUALITY YIE ERING ENVIIMENAL ASSUANCE O

ENGINEERINEG STAFFANGE OFNGE

-EI~

MGINEERINGE STATIi nPLANT 9

Amendment IT4 (Correction) 69 -

Amendment No. 29. 42

ADMINISTRATI ONTROLS 5.1 Responsibility The Southern California Edison Company shall be solely responsible for the operation of San Onofre Nuclear Generating Station Unit 1. Marage ment responsibility at the station and corporate levels; shall be as specified in Section 5.3:

and shall ensure that these environmental technical specifications are fully inplemented and that continued pro tection to the environment shall be provided at all times. Responsibility shall be exercised at the corporate level to provide that the group, individual or organization assigned to audit or otherwise verify that an activity has been correctly performed is independent of the individual, group or organization directly responsible for performing the specific activity. Where other organizations are delegated responsibility for executing portions of these environmental technical specifications, the Southern California Edison Cc:pany shall retain responsibility for all such activities. A detailed description of the program utilized to audit or otherwise-verify that an activity has been correctly perforned shall be developed and submitited to the Directorate of Licensing for review within 4 months of the effective date of these environmental technical specifications.

The audit and verification program shall be established and conducted in accordance with this program description.

5.2 Organization 5.2.1 The corporate organization, :hich provides the line responsibility for the operation of the Sta:ion and the staff responsibilities in support of these operations, is depicted in Figure 5.2-1.

5.2.2 The Station organization utilized in the operation and maintena-e of the Station is depicted i= Figure 5.2-2.

5.2.3

..The Supervisor of Chemistry & Radiation Protection shall be the Onsite Review Committee member responsible for environmental issues. This member shall be qualified in environmental matters.

5.3 Review and Audit Review and audit of Station operations shall be provided by the Onsite Review Committee, the Nuclear Audit and Review Committee, the Nuclear Control Board, and the Quality Assurance Organization.

5.3.1 The membership of the Onsite Review Co=ittee and the responsibilities and authorities of the Comittee with respect to these environmental technical specifications are as follows:

a.

Membership (1) Plant Manager (Chairman)

(2) Superintendent (3) Supervising Engineer (4) Supervisor of Plant Operations (5) Supervisor of Plant Instrumentation (6) Supervisor of Chemical & Radiation (7) Supervisor of Plant Maintenance (8) Nuclear Engineer (9) San Diego Gas & Electric Representative (Correction)

'5-1 Amendment No. AB9, 42

CHAIRMAN OF THE BOARD PRESIDENT SENIOR VICE PRESIDCPS (FUEL SUPPLY (POWER SUPPLY)

(SYSTEM (ENINEERING (ADVANCED OcTfmL 1I DEVELOPMNT)

CONSRUCTrION~)

EGNEIGOR GENERAL NCE SUPERIj DENT jUDI MANAGER OF MANAGER OF MANAGER OF COMITIE STEAM GENERATION ENVIRONMENTAL ENGINEERING DESIGN AFFAIRS O

MANAGER M

GENERATION ENGINEERINM SERVIES HEC(JArESMANAGER, CHIEF OF CHIEF OF MANAGERI S

F NUCLEAR GENERATION NUCLEAR DEVPE AND PSALITY N

ENGINEERIN(

EINERN AL ASSURANCE C

ENGINEERING)I L~ATICN m

- m - - -

AUDIT ANDN STAFM MANAGER REV IEW FIGURF 5.2-1 SOUTHFR' CALIFORNIA EDISOl COMPANY CORPORATE ORGANIZATION (correction) 5-2 Amendment No. ~,42

5.32 The membership of the Nuclear Audit and Review Committee and the responsibilities and authorities of the Committee with respect to these environmental technical specifications are as follows:

a.

Membership (Chairman designated by the Nuclear Control Board)

(1) Manager, Generation Engineering Services (2) Manager of Environmental Affairs (3) Manager of Steam Generation (4) Chief of Nuclear Engineering (5) Chief of Development & Environmental Engineering (6) Manager of Quality Assurance (7) Manager, Nuclear Generation (8) San Diego Gas & Electric Representative

b.

Responsibilities (1) Review and investigate reports concerning violations of the Environmental Technical Specifications. Where investigation indicates, evaluate and prepare recommenda tions to prevent their recurrence.

(2) Review proposed changes to the Environmental Technical Specifications. Coordinate environmental technical specifications with the safety technical specifications to avoid conflicts and maintain consistency. Submit approved proposed changes to the Environmental Technical Specifications to the Nuclear Control Board for transmittal.

(3) Review and approve proposed changes to the facility and its procedures or proposed tests or experiments which are forwarded by the Onsite Review Committee when they involve a change in the Environmental Technical Specifications, or a change which would significantly alter the environmental impact of the facility. Submit such proposed changes when required with appropriate environmental analysis to the Nuclear Control Board for transmittal.

(4) Review all environmental surveillance programs for compliance with these environmental technical specifications.

(5) Review all design'changes related to changes in the Station which relate to the environmental impact of the station and its operation.

(6) Review overall facility activities as they relate to environmental impact by:

(a) formal facility review annually and as directed by the Committee Chairman.

(Reinstated by correction 55 Amendment No. 39 letter)