Concludes That Interim Operation of Tdi Diesel Engines as Emergency Power Sources Until Next Refueling Outage Acceptable & Meets GDC 17 Requirements Based on Review of 860417 Response Re Crankshaft Fatigue
ML13324A872
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/27/1986
From: Dudley R
Office of Nuclear Reactor Regulation
To: Baskin K
Southern California Edison Co
References
NUDOCS 8605300296
Download: ML13324A872 (4)


Text

00 Docket No.:

50-206 MAY 2 7 1986 Mr. Kenneth P. Baskin, Vice President Nuclear Engineering Safety and Licensing Department Southern California Edison Company 2244 Walnut Grove Avenue P.O. Box 800 Rosemead, California 91770

Dear Mr. Baskin:

SUBJECT:

TRANSAMERICA-DELAVAL (TDI) DIESEL ENGINE RELIABILITY AND OPERABILITY Re:

San Onofre Nuclear Generating Station Unit (SONGS-1)

Reference 1:

Letter dated November 19, 1984, D. M. Crutchfield (NRC) to K. Baskin (SCE)

Reference 2:

Letter dated March 14, 1986, G. E. Lear (NRC) to K. Baskin (SCE)

Reference 3:

Letter dated April 17, 1986, M. Medford (SCE) to G. Lear (NRC)

Reference 1 transmitted the NRC staff's Safety Evaluation regarding the TDI diesel engines used as emergency power sources at SONGS-1. The staff concluded that these engines would continue to provide reliable standby power in accordance with the requirements of General Design Criterion 17 (GDC-17) until the next refueling outage. The November 19, 1984 letter also stated that the staff would address long-term operability of these engines after completing the review of the generic TDI Owners Group Program Plan. A draft of the staff's Safety Evaluation addressing the generic TDI issue was sent to you by Reference 2. The staff's final Safety Evaluation on the TDI Owners Group Program is expected to be issued in a few weeks.

Because of staff concerns described in Reference 2 related to crankshaft transient torsional stresses, the staff will not be able to complete the evaluation of long-term operability of the SONGS-1 engines prior to restart from the current refueling outage. However, your April 17, 1986 response (Reference 3) to our draft Safety Evaluation committed to investigate methods to fully resolve the crankshaft fatigue problem. You also stated SCE's position that the currently recommended periodic inspections of the crankshaft will fully ensure the continued safety and reliability of the engines until 86O300296 860527 PDR ADC o

DOCK 05000206 PDR

-2 suitable corrective modifications have been completed or other agreements have been reached with the NRC.

The staff notes that Section 4.8.5 of our contractor's Technical Evaluation Report, (PNL-5600), transmitted to you by Reference 2, is in agreement with SCE's position. Our contractor concludes and the staff agrees that during startup and coastdown of the San Onofre 1 engines, crankshaft stress cycles are beyond the endurance limit of the material and thus are likely to event ually lead to the initiation of fatigue cracks.

Crack growth models predict that a crack which has reached a depth of 18 mils would be able to propogate under steady-state stresses. It is reasonable to assume that cracks larger than 10 mils could be readily detected by crankshaft inspections. Analysis indicates that the number of engine start-stop cycles over which a crack is predicted to grow from 10 mils to 18 mils is on the order of 100. During a typical fuel cycle at SONGS-1, the engines would be started less than 50 times.

Thus, the staff concludes that during a single fuel cycle, an assumed crack that is less than 10 mils and not detected by crankshaft inspections would not propogate to the 18 mil depth at which it could grow under steady-state conditions.

SCE has performed thorough inspections of both SONGS-1 engines during the current refueling outage and has stated that no cracks were found in the engine crankshafts. Your May 19, 1986 submittal provided complete results of the inspection performed on Engine No. 1 and committed to provide a similar report for Engine No. 2 by June 13, 1986. Based upon these inspections and the above discussion, the staff concludes that interim operation of the SONGS-1 engines until the next refueling outage is acceptable and will provide reliable standby power in accordance with the requirements of GDC-17, subject to the following conditions:

1. Prior to restart from the current outage, provide a written commitment to comply with the May 1, 1986 revised TDI Owners Group Maintenance/Surveil lance program.
2. Within 45 days after facility restart, propose a schedule for investigation of alternatives and associated corrective actions to reduce crankshaft transient torsional stresses.
3. Within 90 days after facility restart, provide
a. a detailed report on the status and implementation dates and/or schedules for all Owners Group Phase 1 and Phase 2 recommendations for quality revalidation inspection and component replacement or modification; and
b. a revision to your February 14, 1985 license amendment application to modify your proposed technical specifications so that "slow" starts of the diesel generators are at least 24 seconds in duration and thus consistent with the torsiograph data provided by your April 22, 1985 submittal, or a detailed technical justification for the "slow" start duration in your application.

0

-3 The information requested above will be examined by the staff as part of the long-term operability review of the SONGS-1 engines.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents, therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Richard F. Dudley, Project Manager Project Directorate #1 Division of PWR Licensing-A cc's:

See Next Page Office:

LA/PAD#1 PM/PAD#1 PWR-A R

PD/PAD 1 Surname:

PShuttleworth RDudley/tg CBerlinger JM lhoan Eo GLear Date:

05/ /86 05/1)/86 05/60/86 05/,t i/86 05/;386 05

/86

MAY 2 7 M Distribution Copies:

Docket No. 50-206 NRC PDR Local PDR PAD#1 r/f PAD#1 p/f TNovak, Actg. DD CRossi EMurphy CBerlinger AChaffee ELD EJordan BGrimes JPartlow GLear RDudley PShuttleworth ACRS (10)