Southem California Edison Company P. 0. BOX oo 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER. NUCLEAR LICENSING (818) 302-1749 December 4, 1985 Director, Office of Nuclear Reactor Regulation Attention:
J. A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Auxiliary Transformer Tap Settings Optimization San Onofre Nuclear Generating Station Unit 1
References:
A. Letter, M. 0. Medford, SCE, to J. A. Zwolinski, NRC, dated December 20, 1984 B. Letter, M. 0. Medford, SCE, to 3. A. Zwolinski, NRC dated March 6, 1985 Reference A confirmed SCE's commitment to perform a voltage monitoring program to evaluate the tap settings chosen as a result of the Auxiliary Tap Setting Optimization Study dated November 13, 1984. In accordance with Reference B, the results of the voltage monitoring program are provided as an enclosure to this letter.
Based upon the results of the voltage monitoring program, the current tap settings are acceptable for plant operation in Modes 1 through 4.
However, as indicated in the enclosure, under certain loading arrangements on the 480V buses the minimum 480V bus voltage in Modes 1 through 3 could be lower than the minimum starting motor voltage of the saltwater cooling pumps when a safety injection signal is combined with low 230 kV bus voltage.
Therefore, administrative controls will be implemented to avoid the undesirable 480V bus loadings described in the enclosure during operation in Modes 1 through 3.
During Modes 5 or 6, the minimum load condition for the 480V plant system, operation could result in an over-voltage condition on the 480V bus for certain 230 kV bus voltages. In order to avoid this condition, additional administrative controls will be implemented for Modes 5 and 6 operation to lower the 480V bus voltage. These administrative controls could include, but are not limited to changing transformer tap settings or alternate transformer loading.
8512060220 851204 PDR ADOCK 05000206 P
'PDR
Mr. J.
December 4, 1985 If as a result of maintenance operations in the future, the saltwater cooling pump motors are modified to eliminate the potential starting voltage problem, the tap settings could be revised and administrative controls deleted.
If you have any questions, please contact me.
Very truly yours, Enclosure cc:
F. R. Huey, USNRC Senior Resident Inspector
AUXILIARY TRANSFORMER TAP SETTINGS VERIFICATION OF OPTIMIZATION STUDY WITH MONITORING PROGRAM SAN ONOFRE UNIT 1 I.
INTRODUCTION In order to verify the adequacy of the present auxiliary transformer tap settings resulting from the Auxiliary Transformer Tap Settings Optimization Study for San Onofre Unit 1, dated November 13, 1984, a voltage monitoring program was conducted on the Unit 1 auxiliary system.
This report presents the results of the voltage monitoring program.
II. DISCUSSION A. Monitoring Program The monitoring program was conducted on the Unit 1 auxiliary system from November 1, 1984 to February 28, 1985.
As indicated by Figure 1 strip chart recorders were installed to monitor the voltages of the 230 kV bus, 4.16 kV buses 1C and 2C, and 480V buses 1, 2, and 3, and also the power flows on the feeders serving these buses (kw, kvar, and Amps).
Ampere loads of MCCs 1, 1A, 2, 2A, and 3, and the status of all loads were also monitored.
The program monitored all operating modes except Mode 6 (Refueling),
including two start-ups and two SIS (Safety Injection Signal) tests.
B.
Analysis of Results The results of the monitoring program were analyzed in detail as a revision of the Auxiliary Transformer Tap Settings Optimization Study, San Onofre Unit 1.
The results were analyzed using the voltage criteria indicated by Reference 1 and as shown by Table 1. To evaluate the adequacy of the tap settings the most severe cases were extrapolated with computer simulations to obtain the limiting conditions indicated in Reference 1, using a minimum of 217.8 kV and a maximum of 240 kV for the 230 kV bus voltage, and, if needed, changing the load distribution to obtain the most extreme voltages. The major results are discussed in the following paragraphs.
- 1. Recorded Auxiliary System Voltages All auxiliary system voltages, recorded under all conditions during the monitoring program, were within the voltage criteria shown in Table 1.
- 2. Ranges of Recorded 230kV Bus Voltages Contrary to the results of studies of the 230 kV transmission system, indicated in Reference 1, the 230 kV bus voltage seems to be independent of the number of generating units in operation as shown in Figure 2. In particular, during 54 days of operation with both Units 1 and 3, the mean 230 kV bus voltage was only 224 kV with a maximum of 228.5 kV compared to a voltage of 231 kV which was expected with 2 or 3 units in operation.
- 3. Minimum Voltages The minimum momentary voltages occurred during the SIS test (at time T=0 and T=ll sec of the SIS sequence), as predicted by the optimization study in Reference 1.
Extrapolation of the data collected during the monitoring program demonstrated that the minimum voltages meet the voltage criteria of Table 1 except for the following cases:
- a.
Minimum Momentary Bus Voltages (Starting Motors)
As shown by Figure 4, with the present tap settings (identified as "1") the minimum starting motor voltage of the saltwater cooling pump 480V motors (at time T=0 in SIS sequence), could be lower than the minimum starting voltage of 384V (80% of the 480V name plate rating) for the following cases:
- 1) The simultaneous start of both safety injection pumps from the 4.16 kV buses 1C and 2C, component cooling pump C from 480V bus 3, and component cooling pump A and saltwater cooling pump A from 480V bus 1 during an SIS would result in a starting voltage for saltwater cooling pump A which is less than the 80% criterion, if the 230 kV bus voltage is less than 236 kV (see Figure 4).
ii) The simultaneous start of both safety injection pumps from the 4.16 kV buses 1C and 2C, component cooling pump C from 480V bus 3, and saltwater cooling pump B and component cooling pump B from 480V bus 2 during an SIS would result in a starting voltage for saltwater cooling pump B which is less than the 80% criterion, if the 230 kV bus voltage is less than 225 kV (see Figure 4).
The undervoltage problem is more severe for saltwater cooling pump A due to the physical configuration of the plant (the distance from SWC Pump A to 480V bus 1 is almost twice the distance from SWC Pump B to bus 2.)
-3
- b. Minimum Continuous Bus Voltages As shown by Figure 5, with the present tap settings (identified as "1") the minimum continuous 480V bus voltage could be low for both saltwater cooling pumps A&B 480V motors (less than the 90% criterion), if the 230 kV bus voltage is less than 221 kV.
The lower limit of 93%, as shown on Figure 5, is representative of the 90% criterion and a 3% cable voltage drop.
For all other motors powered by the 480V bus, the calculated voltages are higher than the minimum continuous bus voltages.
- c. Maximum Voltages After extrapolation, the maximum continuous voltages are in excess of the values expected in the optimization study of Reference 1. As indicated by Figure 3, under minimum load conditions in Modes 5 or 6, the 480V bus voltages could exceed the limit of 484V (110% of 440V) if the 230 kV bus voltage is more than 222 kV, and the 4160V bus voltage could exceed 4576V (110% of 4160V) if the 230 kV bus voltage is more than 236 kV.
III. CORRECTIVE ACTION The results of the voltage monitoring program reveal that under certain combinations of plant grid voltage and operating conditions, both over and under voltage conditions can exist at motors fed from 480V buses.
Therefore, to eliminate the possible over and under voltage problems, the following corrective actions will be taken.
- 1. Minimum Starting Voltage, Saltwater Cooling Pumps To eliminate the possible undervoltage problems for the saltwater cooling pumps during an SIS, administrative controls will be implemented to avoid the undesirable bus loading described above.
The administrative controls will avoid loading of both a saltwater cooling pump and component cooling pump to the same 480V bus during Modes 1 through 3 operation. During Modes 4 through 6, the automatic safety injection sequencer is blocked.
- 2. Minimum Continuous Bus Voltage, Saltwater Cooling Pumps The minimum continuous voltage problem for the saltwater cooling pumps identified above is not considered to be a significant safety concern for the following reasons:
a)
For the minimum 230 kV voltage of 217.8 kV the 480V bus voltage would be 437V (91% of 480V), 2% below the minimum continuous voltage criterion (see Figure 5).
-4 b) 221 kV was the minimum 230 kV voltage recorded during the monitoring program, with none of the San Onofre Units on-line (see Figure 2).
c) 217.8 kV is the minimum 230 kV bus voltage resulting from a highly unlikely worst postulated failure of the 230 kV system.
Based on the above discussion, no action is required for the minimum continuous bus voltage conditions.
- 3. Maximum Voltages, Modes 5 and 6 To eliminate the potential over-voltage conditions which could occur during Modes 5 and 6 operation, administrative controls will be implemented to manage the 480V bus voltage. The administrative controls will require the 480V bus voltage to be maintained within the operating limits of the equipment so that excessive over-voltage conditions are avoided by tap setting changes or alternate transformer loading. Examples of the possible administrative controls are:
a) changing the tap settings on the service transformers b) changing the tap setting on the auxiliary transformer C c) transferring 4.16 kV buses 1C and 2C from auxiliary transformer C to transformers A and B For planned outages of 7 days or greater, the administrative controls will be placed into effect at the beginning of the outage.
During spurious unplanned outages, the administrative controls will be placed into effect within 7 days of entering and maintaining Mode 5 or 6. The administrative controls will provide for optimum 480V system voltage for both the maximum and minimum 230 kV system conditions.
- 4. Modes 5 and 6 System Operating Bulletin The administrative controls for Modes 5 and 6 will reduce the maximum continuous 480V bus voltage. However, the maximum voltage may exceed the limiting voltage of 484V (110% of 440V) if the 230 kV bus voltage exceeds 230 kV in Modes 5 and 6 (see Figure 3).
Therefore, Edison System Operations will implement a system operating bulletin to maintain the 230 kV bus voltage at 230 kV or less during Unit 1 Modes 5 and 6 operation when San Onofre Unit 2 or 3 is on line and as system demands allow.
It is recognized that the theoretically possible maximum 230 kV bus voltage is 240 kV, but this is an extreme limit and considered unlikely. However, if high 230 kV bus voltages do occur, it would be for short periods of time and would not significantly affect the electrical equipment fed from the 480V buses.
-5 CONCLUSION The present tap settings are acceptable for plant operation in Modes 1 through 4 and do not represent a significant safety concern. The potential undervoltage conditions for the saltwater cooling pumps will be eliminated through administrative control of the 480V bus loading. In Modes 5 and 6 the administrative controls and system operating bulletin will eliminate the potential over-voltage conditions on the 480V equipment.
REFERENCE
- 1.
Letter to 3. A. Zwolinski, NRC, from M. 0. Medford, SCE, dated December 20, 1984.
DA:5293F
Table 1 VOLTAGE LIMITS CRITERIA TRANSFORMER TAPS SETTINGS OPTIMIZATION SAN ONOFRE UNIT 1 AUXILIARY SYSTEM 440V Motors 460V Motors 480V Motors 4160V Motors Voltage Limits Volts Volts Volts Volts
- 1. Bus Voltage Continuous:
Maximum 110 484 110 506 110 528 110 4,576 Minimum 93 409 93 428 93 446 93 3,869 Momentary (Running Motors) 80 352 80 368 80 384 75 3,120 (for up to (for up to (for up to (for up to 60 sec) 60 sec) 60 sec) 15 sec)
- 2. Motor Voltage Momentary (Starting Motor) 80 352 85 391 80 384 75 3,120 The minimum continuous bus voltage limit of 93% and momentary bus voltage limits of 80% and 75% are conservative. They were used to reduce the amount of calculations by avoiding the calculation of the voltage at every terminal.
The actual limits are 90%, 75% and 70%, respectively at the motor terminals with a conservative design limit voltage drop between the bus and the motor terminals of 3% for the continuous voltage limit and 5% for the momentary voltage limits.
DA:5293F
FIGURE I SAN ONOFRE UNIT 1 AUXILIARY SYSTM AION/70RING PROGRAM INSTRUMENT ONE LINE D/AGRAM V
230 KV B.s MA IN AUX/LIARY TRANSPORM'E9R TRANSPORMER C 24.2/4.30 KV XY
/8KV 2000/3.33A4 2000/&334 AA AA V
V 4o/Eov aeoo//Eov 4KV BUS A 4KV B.6tASB 4KV BUS IC 4KV B.da 2 v fv 42Co/d v v 4zo4o v
v qeso/4eov FA.
xv w
a iv w
vw V
V V
40c//4OV 400//EOV 48q/iO/
4080 V
us f 480 V BUS 3 40v BUS 2 I
0 I
I I
MCC/
vCC/A mcca A4CCa
- CCZA 30 WA7T MEASUREMENT
.30 VAR MEASUREMENT A O B VOL7AGB MBAS'RMENT s 0 cRReNr meAsvememAr
FIG JRE 2 RANGES OF VOLTAiGES~
PC0*rID oNi 7rf1F SAN ONOFME 230-kVBL)S DulZING VOLTA-E tMOfJITOPJNC-PRQ$RA NDVEMBE9R It I914.,FERUfl~y 2 6, 1915 UJ,1S OPERATING 23o4(v go-s VaLAG (k)
Vrils Duao 220 2Z No ne 37 E s+; otr) 1 C ri 3 F~4
-V NOME:
Eivi&-BA~ed oh Te~msmrwohi s~i',es og Rtreic
Fi-)re 3
-SANl ONOFRE VNI-r AUYrIL11UY SYSTEM MIIXIM01 CONTINIJOU-5Ss L~5voLrlQE5 R~A'CD 00' E')er tAPLA-rlo OF Vrw04 11,
%P8ST M~OVE CONOITIOP4 VOLTrAGw iAWD Lo-- "'~"NYPR&A
.3~d-vi'y
-~236-kv Bus o4.~
- 4. 1.- kv smss 4'90-V BVSCS AL I
4.1.
IVYI
'0.'x IT 0
IT IL EN IlI LI-L 461510 00 I
04 0
7 ----- ---
~Y I
-77 N)C
to~ TO THE CENTIMETER
~M411 WE IO KUXF F rSI R Co 4651 o-.i'
!w 1; Ph~
I,-1i i-I; iL I i
.1 L; I 4 '
I.: I9 i t I
T IF 7
- ' t-I t t ii
'It I
t P
4J I
.1*~1 q~j I~I diI