Text
DEC 2 6 1984 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 ECO ATTN: Mr. K. P. Baskin, Vice President Nuclear Engineering, Safety and Licensing Gentlemen:
Subject:
Quality Assurance Program Description for San Onofre Units 1, 2 and 3 By letter dated November 2, 1984, (M. 0. Medford to J. B. Martin) the Southern California Edison Company (SCE) submitted Change Notice Number 11 to Topical Report, SCE-1-A "Quality Assurance Program", Amendment 7, dated June 1984, as the current Quality Assurance Program description for San Onofre Nuclear Generating Station Units 1, 2 and 3. This submittal was made in accordance with the requirements of 10 CFR 50.54(a).
Based on our evaluation of the changes implemented by Change Notice Number 11, we find that the revised topical report continues to meet the criteria of Appendix B to 10 CFR Part 50 and is therefore acceptable for Units 1, 2 and 3.
Should you have any questions regarding our review or if we can provide assistance, please contact W. J. Wagner at (415) 943-3731.
Sincerely, D. F. Kirsch, Acting Director Division of Reactor Projects and Safety cc:
W. 0. Belke, QUAB E. M. McKenna, NRR H. Rood, NRR R. Huey, RV Section Chiefs Branch Chiefs Document Control Desk bcc:
RSB/Document Control Desk (RIDS)
Distributed by RV:
- c Mr. Martin File Copy Pink/Green Copy RV/jk WAGNER
()
YOUNG AA KIRSCH 12/;Z/84 12/,2/84 12/1//84 8412310380 841226 PDR ADOCK 05000206 P
RE 0U N ITED STA TES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIA LANE, SUITE 210 WALNUT CREEK, CALIFORNIA 94596 DEC 2 6 1984 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 ATTN: Mr. K. P. Baskin, Vice President Nuclear Engineering, Safety and Licensing Gentlemen:
Subject:
Quality Assurance Program Description for San Onofre Units 1, 2 and 3 By letter dated November 2, 1984, (M. 0. Medford to J. B. Martin) the Southern California Edison Company (SCE) submitted Change Notice Number 11 to Topical Report, SCE-1-A "Quality Assurance Program", Amendment 7, dated June 1984, as the current Quality Assurance Program description for San Onofre Nuclear Generating Station Units 1, 2 and 3. This submittal was made in accordance with the requirements of 10 CFR 50.54(a).
Based on our evaluation of the changes implemented by Change Notice Number 11, we find that the revised topical report continues to meet the criteria of Appendix B to 10 CFR Part 50 and is therefore acceptable for Units 1, 2 and 3.
Should you have any questions regarding our review or if we can provide assistance, please contact W. J. Wagner at (415) 943-3731.
Sincerely,
. F. Kirsch, Acting Director Division of Reactor Projects and Safety