ML13323B225

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-206/86-47,50-361/86-36 & 50-362/86-35 on 861117-20.Areas Not Meeting Stds of Fitness for Duty Program Noted.Response Requested within 60 Days of Ltr Receipt
ML13323B225
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/04/1987
From: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323B226 List:
References
TAC-68699, TAC-68700, NUDOCS 8703090169
Download: ML13323B225 (5)


See also: IR 05000206/1986047

Text

DC-5

jrfk REGLJZ

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D. C. 20555

March 4, 1987

Docket Nus. 50-206

50-361

and 50-362

Southern California Edison Company

ATTN: Mr. Kenneth P. Baskin

Vice President, Nuclear Engineering,

Safety and Licensing

2244 Walnut Grove Avenue

P. 0. Box 800

Rosemead, California 91770

Gentlemen:

SUBJECT:

Inspection Repor 50

6

4

50-361/86-36, and 50-362/86-35

This letter forwards the report of an inspection conducted by an NRC team on

November 17-20, 1986 to review the Southern California Edison Company's fitness

for duty program. This inspection wds conducted jointly by members of Region V

and the Office of Inspection and Enforcement. At the conclusion of the inspection,

the observations were discussed at an exit meeting with those members of your

staff identified in the enclosed inspection report.

The inspection report describes areas where your fitness for duty program does

not appear to meet certain standards adopted by the nuclear power industry in

the EEI Guide to Effective Drug and Alcohol/Fitness for Duty Policy Development.

The report also describes supplemental fitness for duty program elements not

contained in the EEI Guide which were reviewed by the inspection team. The

NRC Policy Statement and EEI Guide describe a generdl approach to designing a

fitness for duty program. In order to evaluate the overall effectiveness of

your program arid to collect information to assist the Commission in deciding

future action in this area, the inspectors reviewed specific elements of the

program not described in the EEI Guide such as topics for written procedures,

cutoff limits for chemical testing, and program performance data. Our review

of these areas is riot intended to imply that they are or may become requirements.

Instead, the data provides information for the staff on the various programs

buing adopted by licensees in support of the Commission's policy.

Withiii 60 days of receipt of this letter, it is requested that you provide this

office with any comments concerning the results of our review, including a

description of your planned actions to further incorporate appropriate provisions

of the EEI guidelines on fitness for duty. Your special attention is directed

to the first three observations addressed in the Inspection Summary.

8703090169 870304

PDR

ADOCK 05o00206

PDR

Southern California Edisun Company

- 2 -

March 4, 1987

Should you have any questions concerning this inspection, please contact me

or Mr. Loren Bush at (301) 492-8080.

Sincerely,

James

Partlow, Director

Divisi o of Inspection Programs

Office of Inspection and Enforcement

Enclosures:

Inspectiun Report 50-206/86-47,

50-361/86-36, and 50-362/86-35

cc w/enclosure:

See next page

Southern California Edison Company

3 -

March 4, 1987

cc w/enclosure:

Mr. James C. Holcombe

Mr. Hans Kaspar, Executive Director

Vice President - Power Supply

Marine Review Committee, Inc.

San Diego Gas & Electric Company

531 Encinitas Boulevard, Suite 105

101 Ash Street

Encinitas, California 92024

Post Office Box 1831

San Diego, California 92112

Ann C. Vasques, Chief

Radiological Programs Division

Charles R. Kocher, Assistant

Governor's Office of Emergency

General Counsel

Services

James Beoletto, Esquire

State of California

Southern California Edison Company

2800 Meadowview Road

Post Office Box 800

Sacramento, California 95832

Rosemead, California 91770

Alan R. Watts, Esq.

David R. Pigott

Rourke & Woodruff

Orrick, Herrington & Sutcliffe

Suite 1020

600 Montgomery Street

1055 North Main Street

San Francisco, California 94111

Santa Alid, California

92701

Mr. Stephern 6. Allman

Mr. S. McClusky

San Diego Gas & Electric Company

Bechtel Power Corporation

P. 0. Box 1831

P. 0. Box 60860, Terminal Annex

San Diego, California 92212

Los Angeles, California 90060

Resident Inspector/San Onofre NPS

Mr. C. B. Brinkman

U.S. Nuclear Regulatory Commission

Combustion Engineering, Inc.

P. 0. Box 4329

7910 Woodmont Avenue, Suite 1310

San Clemente, California 92672

Bethesda, Maryland 20814

Mayor

Mr. Mark Medford

City of San Clemente

Southern California Edison Company

San Clemente, California

92672

2244 Walnut Grove Avenue

P. 0. Box 800

Chai rman

Rosemead, California 91770

Board of Supervisors

County of San Diego

Richard J. Wharton, Esq.

Sin Diego, California 92101

University of San Diego School

of Law

Di retctor

Environmental Law Clinic

Energy Facilities Siting Division

San Diego, California 92110

Energy Resources Conservation

arid Developmient Commissiun

Charles E. McClung, Jr., Esq.

1516 - 9th Street

Attorney at Law

Sacramento, California 95814

24012 Calle de la Plaza/Suite 330

Lagun, Hills, California 92653

Joseph 0. Ward, Chief

Radiological Health Branch

Mr. Pat Beard

State Department of Health Services

Institute of Nuclear Power Operations

.

714 P Street, Office Bldg. 8

1100 Circle 75 Parkway

Sacramento, California 95814

Suite 1500

Atlanta, Georgia 30339

.

Suthern California Edison Company

-

4 -

March 4, 1987

cc w/enclosure:

Mr. D. J. Fugarty

Executive Vice President

Nuclear Engineering & Operations

Southern California Edison Company

2244 Wdlnut Grove Avenue

P. 0. Box 800

Rosemead, California 91770

Mr. H. B. Ray

Vice President, Site Manager

Southern California Edison Company

P. 0. Box 128

San Clemente, California 92672

Mr. H. E. Morgan

Station Mdnager

Southern California Edison Company

P. 0. Box 128

San Clemente, California 92772

.

Southern California Edison Company

- 5 -

March 4, 1987

DISTRIBUTION:

DCS

NRC PDR

Local PDR

ORPB Reading

DI Reading

JMTaylor

JGPartlow

RLSpessard

PFMcKee

LJCunningham

LLBush

RPRosano

ELJordan

BKGrimes

ABBeach

JBMartin, Region V

RAScarano, Region V

RJPate, Region V

PHJohnson, Region V

PMQualls, Region V

FJMiraglia,

NRR

GWKnighton,

NRR

HRood, NRR

HLThompson, NRR

GELear, NRR

RFDudley, NRR

TEMurley, RI

JNGrace, RII

JGKeppler, RIII

RDMartin, RIV

  • For previous concurrences, see attached ORC

OFC :IE:0 B

IE:ORPB
IE:ORPB
IE:DD/DI
IE:

I

NO

LBush:esp

  • JCunningham:*PFMcKee
RLSpe ard :JGPar low

D

12/18/86
12/19/86
12/19/86
3

/87

3/1187