Docket Nos. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 92770
Attention: Mr. Kenneth P. Baskin, Vice President
Nuclear Engineering Safety and Licensing
Gentlemen:
This refers to a routine inspection conducted by Messrs. F. R. Huey, J. P.
Stewart, A. D'Angelo, J. E. Tatum, and Ms. R,. C. Tang of this office during the
period of May 13 through June 6, 1986 of activities authorized by NRC License
No. DPR-13, and to the discussion of our findings held by the inspectors with
Mr. H. B. Ray and other members of the Southern California Edison staff at the
conclusion'of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspectors.
No violations of NRC requirements were identified within the scope of.the
inspection.
In accordance with 10 CFR 2.790(a)., a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss.them with you.
Sincerely,
A. E. Chaffee, Chief.
Reacpor Projects Branch
Enclosure:
Inspection Report No 50-206/86-22
cc w/enclosure:
D. J. Fogarty, Executive Vice President
H. B. Ray, Vice President (San Clemente)
H. E. Morgan, Station Manager (San Clemente)
State of California
b
P
n
AChaffee
06/
86
06/1/86
06/ /86
. 8606250007 860609
ADOCK 05000206
~PDR__
D_