ML13323A964

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-206/85-01,50-361/85-01 & 50-362/85-01 on 841216-850119.No Violation Noted
ML13323A964
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/22/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A966 List:
References
NUDOCS 8503150007
Download: ML13323A964 (2)


See also: IR 05000206/1985001

Text

pf REQU

05

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE, SUITE 210

WALNUT CREEK, CALIFORNIA 94596

9 2 218

Docket Nos. 50-206, 50-361, 50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 92770

Attention: Mr. Kenneth P. Baskin, Vice President

Nuclear Engineering Safety and Licensing

Gentlemen:

Subject: NRC Inspection of San Onofre Units 1, 2 and 3

This refers to the routine inspection conducted by Messrs. F. R. Huey,

J. P. Stewart, A.J. D'Angelo, and J. E. Tatum of this office during the period

of December 16, 1984 through January 19, 1985 of activities authorized by NRC

.

License Nos. DPR-13, NPF-10 and NPF-15 and to the discussion of our findings

held by the inspectors with Mr. Jerry Haynes and other members of the Southern

California Edison staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2 .790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

9503150007 8 50 2 2 2

1

PDR ADOCK 05000206

G

PDR

Southern California Edison Company

-

2 -

8 2 2

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

D. F. Kirsch, Acting Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection Report

Nos. 50-206/85-01

50-361/85-01

50-362/85-01

cc w/enclosure:

D. J. Fogarty, Executive Vice-President

H. B. Ray, Vice President (San Clemente)

J. G. Haynes, Station Manager (San Clemente)

State of California

R

dh

JS'

t j'Ailo <

m

P

on

AChaffee

DKirsch

2/ /S /85

2//<j85

2/ /C</85

2//,785

2/ 1 785

2/,9Z/85

2/92/85