ML13323A869

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/80-23 on 800818-22.No Noncompliance Noted
ML13323A869
Person / Time
Site: San Onofre 
Issue date: 09/30/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A870 List:
References
NUDOCS 8010310385
Download: ML13323A869 (2)


See also: IR 05000206/1980023

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

.

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President Advanced Engineering

Gentlemen:

Subject:

NRC Inspection Report

This refers to the inspection conducted by Mr. M. Cillis, R. Curtis and

G. Yuhas of this office on August 18-22, 1980 of activities authorized by

NRC (license) No. DPR-13, and to the discussion of our findings held by

Mr. G. Yuhas with Mr. R. Brunet and other members of your staff at the

conclusion of the inspection, and to the discussion of your radiation

protection program held by Mr. Engelken and members of his staff with

you and other representatives of the Southern California Edison Company

at the Region V office in September.5, 1980.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that.you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

0

Southern California Edison Company

-2-

1 Sa8

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

R. H. Engelken

Director

A. Appendix A -

Notice of Violation

B. IE Investigation Report

No. 50-206/80-23

cc w/o enclosure B:

R. Dietch, Vice President

Nuclear Engineering and Operations, SCE

J. M. Curran, SCE