ML13323A779
| ML13323A779 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/21/1980 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Paypay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13323A780 | List: |
| References | |
| NUDOCS 8005280060 | |
| Download: ML13323A779 (2) | |
See also: IR 05000206/1980002
Text
pj3 REGUJSTTE
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
FEB 11 1980
Docket No. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay
Vice President, Advanced Engineering
Gentl emen:
Subject:
NRC Inspection -
San Onofre Unit 1
This refers to the inspection conducted by Mr. L. Miller of this office on
January 7-25, 1980, of activities authorized by NRC License No. DPR-13, and
to the discussion of our findings held by Mr. Miller with Mr. R. Brunet and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser
vations by the resident inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy.of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 30 days
of the date of this letter, requesting.that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that.the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
os
0 05oo(0
FEB 311 196
Southern California Edison Company
-2
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerel y,
I (cews, Chief
IReactor
Operations
and
Nuclear Support Branch
Enclosure:.
Inspection
Report
.No. 50-206/80-02
cc w/o Enclosure:
R. Dietch, Vice President
Nuclear Engineering and Operations,
J. M. Curran,