ML13323A779

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/80-02 on 800107-25.No Noncompliance Noted
ML13323A779
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/21/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Paypay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A780 List:
References
NUDOCS 8005280060
Download: ML13323A779 (2)


See also: IR 05000206/1980002

Text

pj3 REGUJSTTE

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

FEB 11 1980

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President, Advanced Engineering

Gentl emen:

Subject:

NRC Inspection -

San Onofre Unit 1

This refers to the inspection conducted by Mr. L. Miller of this office on

January 7-25, 1980, of activities authorized by NRC License No. DPR-13, and

to the discussion of our findings held by Mr. Miller with Mr. R. Brunet and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser

vations by the resident inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy.of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 30 days

of the date of this letter, requesting.that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that.the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

os

0 05oo(0

FEB 311 196

Southern California Edison Company

-2

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerel y,

I (cews, Chief

IReactor

Operations

and

Nuclear Support Branch

Enclosure:.

IE

Inspection

Report

.No. 50-206/80-02

cc w/o Enclosure:

R. Dietch, Vice President

Nuclear Engineering and Operations,

SCE

J. M. Curran,

SCE