Forwards IE Insp Rept 50-206/80-03 on 800129-0201 & 06-07 & Notice of Violation
ML13323A706
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/10/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A703 List:
References
NUDOCS 8005220220
Download: ML13323A706 (2)


See also: IR 05000206/1980003

Text

UNITED STATES

'NUCLEAR

REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

MAR1

18

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California

91770

Attention:

Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Messrs. D. P. Haist and J. 0.

El1n of this office on January 29 - February 1 and and February 6-7, 1980

of activities authorized by NRC License No. DPR-13, and to the discussion of

our findings held by Messrs. Haist and Elin with Mr. J. M. Curran and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspec

tion report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with per

sonnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activ

ities was not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A. This

item of noncompliance has been categorized into a level as described in

our correspondence to all NRC licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regu

lations. Section 2.201 requires you to submit to this office, within thirty

(30) days of your receipt of this notice, a written statement or explanation

in reply including (1) corrective steps which have been taken by you and

the results achieved; (2)

corrective steps which will be taken to avoid

further violations; and (3) the date when full compliance will be achieved.

8005220 220

Southern California Edison Company

-2-

INR

A R

1980

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 30 days

of the date of this letter, requesting that such information by withheld from

public disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The appli

cation should be prepared so that any proprietary information identified

is contained in an enclosure to the application, since the application with

out the enclosure will also be placed in the Public Document Room. If we

do not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

Should you have any questi'ons concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

G .

Sp cer, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

A. Notice of Violation

B. IE Inspection Report

No. 50-206/80-03

cc w/o enclosure B:

Mr. R. Dietch,

Mr. J. M. Curran

0