ML13323A697
| ML13323A697 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/08/1980 |
| From: | Book H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Arenal A SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13323A698 | List: |
| References | |
| NUDOCS 8005160444 | |
| Download: ML13323A697 (2) | |
See also: IR 05000206/1980006
Text
0
UNITED STATES
8005160
A-
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
o'SUITE
202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
APR 8
1980
Docket No. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Mr. A. L. Arenal
Vice President, Advanced Engineering
Gentlemen:
Subject: NRC Inspection of San Onofre Unit 1
This refers to the inspection conducted by Mr. J. R. Curtis of this
office on March 3 - 7, 1980, of activities authorized by NRC License
No. DPR-13 and to the discussion of our findings held by Mr. Curtis with
Mr. R. Brunet and other members of the San Onofre Unit 1 staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that
911
Southern California Edison Company
-2
APRb
1980
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public-Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
H. E. Book, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
IE. Inspection Report
No. 50-206/80-06
cc w/o enclosure:
J. T. Head, SCE