Text
NS REGu47'
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
JAN 2
1980
Docket No. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay
Vice President, Advanced Engineering
Gentlemen:
Subject:
NRC Inspection - San Onofre Unit 1
This refers to the inspection conducted by Mr. L. Miller and others of this
office on December 10-13, 1979 of activities authorized by NRC License No.
DPR-13, and to the discussion of our findings held by Mr. Miller with Mr. J.
Curran and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and ob
servations by the inspectors.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with the NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A. These items of
noncompliance have been categorized into a level as described in our corres
pondence to all NRC licensees dated December 31, 1974.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
Southern California Edison Company
-2-
JAN Z
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application.without the enclosure will
also be placed in the Public Document Room. If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
J-<d.
L. Crews,
Chief
Reactor Operations aM
Nuclear Support Branch
Enclosures:
1. Appendix A
2. IE Inspection Report
No. 50-206/79-17
cc w/o enclosure #2:
R. Dietch, Vice President
Power Supply, SCE
J. M. Curran, SCE