Forwards IE Insp Rept 50-206/79-17 on 791210-13 & Notice of Violation
ML13323A635
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/21/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A632 List:
References
NUDOCS 8003050119
Download: ML13323A635 (2)


See also: IR 05000206/1979017

Text

NS REGu47'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

JAN 2

1980

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President, Advanced Engineering

Gentlemen:

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Mr. L. Miller and others of this

office on December 10-13, 1979 of activities authorized by NRC License No.

DPR-13, and to the discussion of our findings held by Mr. Miller with Mr. J.

Curran and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and ob

servations by the inspectors.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with the NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A. These items of

noncompliance have been categorized into a level as described in our corres

pondence to all NRC licensees dated December 31, 1974.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

Southern California Edison Company

-2-

JAN Z

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application.without the enclosure will

also be placed in the Public Document Room. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

J-<d.

L. Crews,

Chief

Reactor Operations aM

Nuclear Support Branch

Enclosures:

1. Appendix A

2. IE Inspection Report

No. 50-206/79-17

cc w/o enclosure #2:

R. Dietch, Vice President

Power Supply, SCE

J. M. Curran, SCE

San Clemente, CA