ML13323A624

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/79-15 on 791015-19 & 1030-1102. No Noncompliance Noted
ML13323A624
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/10/1979
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A625 List:
References
NUDOCS 8001100563
Download: ML13323A624 (2)


See also: IR 05000206/1979015

Text

tVkREGj,

0

WUNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

.

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

December 10, 1979

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. A. Arenal

Vice President, Advanced Engineering

Gentlemen:

Subject:

NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Mr. J. R. Curtis of this

office on October 15-19 and October 30-November 2, 1979 of activities

authorized by NRC License No. DPR-13, and to the discussion of our

findings held-by Mr. Curtis with Messrs. J. Curran, R. Brunet, and the

San Onofre Unit 1 staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

8001il w.

-Southern California Edison Company

-2-

December 10, 1979

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

H. E. Book, Chief

Fuel Facility and'Materials

Safety Branch

Enclosure:

IE Inspection Report

No. 50-206/79-15

cc w/o enclosure:

J. T. Head, SCE

J. M. Curran, SCE, San Clemente, CA