Forwards IE Insp Rept 50-206/79-14 on 790907-08 & 10-13.No Noncompliance Noted
ML13323A621
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/26/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A622 List:
References
NUDOCS 7912050094
Download: ML13323A621 (2)


See also: IR 05000206/1979014

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA94596

OCT 6l/

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Mr. A. Arenal

Vice President, Advanced Engineering

Gentl emen:

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Messrs. L. Miller and

A. Horn of this office on September 10-13, 1979 and by our Resident

Inspector, Mr. R. Pate on September 7-8, 1979, of activities authorized

by NRC License No. DPR-13, and to the discussion of our findings held by

Mr. Miller with Mr. G. Morgan and other members ofjybur staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in

terviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

212050

?Y

Southern California Edison Company

-2-

OCT

1979

the application, since the application without the enclosure will also

be placed in the Public Document Room. If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions, concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

J. L. Crews, Chief

Reactor Operations an_

Nuclear Support Branch

Enclosure:

IE Inspection Report

No.

50-206/79-14

cc w/o enclosure:

J. T. Head, Vice President

Power Supply, SCE

J. M4.

Curran, SCE