ML13323A611

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/79-11 on 790723-27.No Noncompliance Noted
ML13323A611
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/05/1979
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A612 List:
References
NUDOCS 7910160183
Download: ML13323A611 (2)


See also: IR 05000206/1979011

Text

4 RE~ yU

N IT ED STA T ES

-7

NUCLEAR REGULATORY COMMISSION

vK

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

September 5, 1979

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. A. Arenal

Vice President, Advanced Engineering

Gentlemen:

Subject:

NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Mr. J. B. Curtis of this

office on July 23-27, 1979 of activities authorized by NRC License No.

DPR-13 and to the discussion of our findings held by Mr. Curtis with

Mr. R. Brunet and members of the San Onofre Unit 1 staff at the con

clusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared'so

7910i8

1 &'3

Southern California Edison Company

-2-

September 5, 1979

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any.questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

H. E. Book, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

IE Inspection Report

No. 50-206/79-11

cc w/o enclosure:

J. T. Head, SCE

J. M. Curran, SCE, San Clemente, CA