Forwards IE Insp Rept 50-206/79-10 on 790606-20.No Noncompliance Noted
ML13323A600
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/10/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A601 List:
References
NUDOCS 7909050202
Download: ML13323A600 (2)


See also: IR 05000206/1979010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

4~

WALNUT CREEK, CALIFORNIA 94596

Docket No. 50-206/7

I

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Mr. J. B. Moore

Vice President

Gentlemen:

Subject:

NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Messrs. D. P. Haist, P. P. Narbut

and R. J. Pate of this office during the period of June 6-20, 1979, of activities

authorized by NRC License No. DPR-13, and to the discussion of our findings held

by Messrs. Haist and Pate with Mr. J. M. Curran and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within'these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser

vations by the inspectors.

No items of noncompliance with NRC requirements were identified within the scope

of this inspection.

In accordance withSection 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

oo09050 202

Southern California Edison Company

-2-

JUL 10

s

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

No. 50-206/79-10

cc w/o encl:

J. T. Head, Vice President

Power Supply, SCE

J. M. Curran, SCE