ML13323A565

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Rept 50-206/78-14 on 781010-13 & 1024-27 & Notice of Violation
ML13323A565
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/15/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A566 List:
References
NUDOCS 7812210370
Download: ML13323A565 (2)


See also: IR 05000206/1978014

Text

.G

UNITED

STATES

NUCLEAR

REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

-WALNUT CREEK, CALIFORNIA

94596

-Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770.

Attention: Mr. J. B. Moore

Vice President

Gentl emen:

Subject:

NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Messrs. R. J. Pate and

D. P. Haist of this office on October 10-13 and October 24-27, 1978,

of activities authorized by NRC License No. DPR-13, and to the dis

cussion of our findings held by Mr. Pate with Mr. J. M. Curran,

Mr. H. B. Ray, and other members of your staff at the conclusion

of the inspection.

The inspection was an examination of your inservice inspection

activities. Within these areas, the inspection consisted of selec

tive examinations of procedures and representative records, interviews

with personnel and observations by the inspectors.

Based on the results of this inspection, it appears that one of

your activities was not conducted in full compliance with the NRC

requirements, as set forth in the Notice of Violation, enclosed

herewith as Appendix A. This item of noncompliance has been cate

gorized into a level as described in our correspondence to all NRC

licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

78I.?JL o3

Southern Cal ifornia Edison Company

-2-

v

6/8

Fwithin twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including: (1) corrective steps

which have been taken by you and the results achieved; (2) corrective.

steps which will be taken to avoid further violations; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you be

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is

.contained in an enclosure to the application, since the application

without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

W

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. Sp ncer, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A - Notice of Violation

2. IE Inspection Report No.

50-206/78-14

cc w/enclosure 1:

J. T. Head, Vice President

Power Supply, SCE

J. M. Curran, SCE