IE Inspec Repts 50-206/78-15 on 781016-19 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Radiat Protec Prog During Refueling Outage & Followup Activity
ML13323A563
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/03/1978
From: Curtis J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML13323A564 List:
References
50-206-78-15, NUDOCS 7812150185
Download: ML13323A563 (5)


See also: IR 05000206/1978015

Text

U. S.

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION V

Report No. 50-206/78-16

Docket No. 50-206

License No, DPR-13

Safeguards Group

Licensee:

Southern California Edison Company

P. 0. Box 800, 2244 Walnut Grove Avenue

Rosemead, California 91770

Facility Name: San Onofre Unit 1

Inspection at:

Camp Pendleton, California

Inspection conduct d 2 October 16-19, 1978

Inspectors: 9/r

X7

W. R. Curtis, Radiation Specialist

/

sate Signed

Date Signed

Date Signed

Approved

By:

21c7_

E. Book, Chief, Fuel Facility and Materials

Date Signed

Safety Branch

Summary:

Inspection on October 16-19, 1978 (Report No. 50-206/78-16)

Areas Inspected:

Routine, unannounced inspection of the Radiation Pro

tection Program during the refueling outage, and some followup activity

related to the status of confirmatory measurement sample analysis, and

emergency plan tests and drills.

The inspection involved 38

man-hours

onsite by one NRC inspector.

Results:

No items of noncompliance or deviations were identified.

RV Form ?19(2)

7812 150(5 5

DETAILS

Persons Contacted

  • J. Curran, Plant Manager
  • R. Brunet, Superintendent Unit 1
  • M. Sullivan, Chemical Rad-Protection Supervisor

J. Mortensen, Chemical Rad-Protection Engineer

G. Peckham, Chemical Rad-Protection Engineer

D. Bihi, Chemical Rad-Protection Engineer

  • G. McDonald, QA/QC Supervisor
  • D. Dunn, QA Supervisor
  • H. Key, Chemical Rad-Protection Foreman

The inspector also interviewed other members of the SONGS-1 staff.

  • Denotes attendance at exit interview.

2. Radiation Protection Procedures

Samples of radiation protection procedures related to operations

conducted during the refueling outage were reviewed. Changes in

procedures related to access control, tabulation and maintenance of

airborne radioactivity'and external personnel radiation exposure

had been made and were put into effect. They were beneficial to

the access control and radiation.protection effort.

The licensee has a program for periodic review of procedures that

is in use and the Chemical/Radiation Protection Supervisor has

initiated additional radiation protection procedure review effort

by a staff radiation protection engineer.

No items of noncompliance or deviations were identified.

3. Advance Planning and Preparation

Licensee representatives of the radiation protection staff were

interviewed regarding plans and preparations for the refueling

outage. The inspector observed that these plans and procedures

were being utilized in the radiation protection program during the

outage.

No items of noncompliance or deviations were identified.

-2

4.

Training

Radiation protection training for the refueling met the require

ments of licensee procedures and 10 CFR 19.12. In some cases

involving the requirements for authorized access to the containment

sphere, formalized walk-thru indoctrination tours and documentation

had not been accomplished. This was discussed at the exit inter

view and licensee representatives indicated that the qualification

procedure would be formalized to assure that the formal indoctrina

tion tours would be accomplished and documented in the future.

No items of noncompliance or deviations were identified.

5. External Exposure Control

The licensee utilizes a sophisticated system for documentation and

updating of records of personnel exposure. Self-reading dosimeters

are used to indicate short term exposure. These are supplementary

devices to the SCE TLD and Landaur film dosimeters used. The

accumulated exposure for all persons entering the controlled area

is updated at least daily. Quarterly exposure limits for individuals

is controlled by limiting access to radiation areas. Whenever the

individual's reported dose exceeds 1800 mRem, written management

approval is required to authorize further access to the controlled

area. The individual's monthly personal dosimeter is processed and

his official exposure updated before access is allowed.

There was no evidence of personnel exposure exceeding regulatory

limits.

No items of noncompliance or deviations were identified.

6. Respiratory Protection Program

The licensee has an established program for evaluating airborne

radioactivity based on air sample analysis and the determination of

average airborne radioactivity concentration. The routine air

sampling program has been expanded to cover more area during the

refueling outage. Special air samples, special precautions and

engineering controls are utilized on projects when unusual airborne

activity is anticipated.

Respiratory protection has been formally prescribed for steam

generator tube plugging operations. Approved filtered air hoods

are utilized in this operation and a protection factor of 1000 is

applied to air sample data.

Assignments of MPC hour exposure are made and tabulated for all

persons who enter areas when airborne activity is anticipated and

air samples are taken.

-3

SCE radiation protection staff members were interviewed regarding

training for.use, fitting, maintenance and storage of the self

contained, filtered air hoods usedin the respiratory protection

program. Licensee action in this area was adequate; to date the

use was of limited scope. The maintenance program had not been

formalized and documentation of various aspects of the program was

being established. This was discussed at the exit interview and

licensee management representatives indicated that action to im

prove documentation and formalization of the program would be

taken.

No items of noncompliance or deviations were identified.

7. Posting and Access Control

The licensee's program for refueling outage surveillance includes

special and routine surveys in the containment sphere and other

portions of the controlled area. Appropriate signs are posted at

the access control points. The containment sphere is posted as a

"High Radiation Area."

Locations at which significant radiation

levels are measured are posted with signs and, in some cases, by

barriers and signs. Radiation levels indicated are related to

levels found during routine or special surveys.

One area at the -10 foot level of the containment sphere was posted

with a sign indicating significantly higher radiation levels. A

radiation level of 200 R/hr was detectable in a generally in

accessible area when measured with an extended probe, teletector

survey instrument. Sheet lead and bags of lead shot shielding had

been placed in and around the location and barriers with signs had

been erected around the general area. General access to the con

tainment sphere is controlled and a system utilizing colored arm

bands and work permits was utilized to further control access

within the sphere.

No items of noncompliance or deviations were identified.

8. Surveys

See Item 7, Posting ...

above. Interviews with licensee staff were

conducted regarding the survey program for refueling operations.

Sample records of routine swipe and radiation levels were examined.

No items of noncompliance or deviations were identified.

9. Confirmatory Measurements

The inspector discussed the status of results of the analysis of

confirmatory measurement samples. Mock charcoal cartridge and

particulate filter samples have been provided. They have been

-4

analyzed on the licensee's GeLi detector/multi-channel analyzer

system.

Isotopes were identified and activities as of July 1, 1978

were being calculated and would be submitted to Region V.

No items of noncompliance or deviations were identified.

10. Emergency Plan Tests and Drills

Continued licensee activity regarding emergency response review and

planning for tests and drills was reviewed by the inspector. The

June 13, 1978 drill was principally involved with offsite mobili

zation and communication, and did not involve onsite personnel to a

great extent. Licensee management was asked for clarification

regarding their understanding of the requirement for an annual

exercise involving onsite personnel and coordination with offsite

response groups, at least at the level of communication link checks.

The next exercise is projected to involve onsite personnel and

licensee representatives indicated that offsite communication links

would be incorporated in the drill to meet the annual drill require

ment.

No items of noncompliance or deviations were identified.

11.

Exit Interview

An exit conference was held with SONGS-1 staff and management

personnel (denoted in Paragraph 1) to review the scope and findings

of the inspection including those items referred to in Paragraph 4, 6

and 10 of this report. The inspector advised licensee represent

atives that no items of noncompliance were. identified.