p> REGoj
UNITED STATES
wc
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
AUG 2 29
Docket Nos. 50-361,
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject:
NRC Inspection at San Onfore Units 2/3
This refers to the inspection conducted by Mr. J. H. Eckhardt and P. P. Narbut
of this office on June 17-20 and July 14-18, 1980 of activities authorized
by NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions of his
findings held with you and members of your staff on June 20 and July 18, 1980.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and observations
by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10 Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 30
days of the date of this letter, requesting that such information be withheld
from public disclosure. The application must include a full statement of
the reasons why it is claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is contained
in an enclosure to the application since the application without the enclosure
will also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
....................
AUG 22 980
Dr. L. T. Papay
-2
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
G. S. Spencer, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
IE Inspection Report
Nos. 50-361/80-10
50-362/80-07
cc w/o enclosure:
R. Dietch, Vice President
Nuclear Engineering & Operations, SCE