og
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
'
SUITE 202, WALNUT CREEK PLAZA
4.
WALNUT CREEK, CALIFORNIA 94596
JAN
4 8
Docket Nos.f5
(0-362-
Southern California Edison Company
P.O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay
Vice President, Advanced Engineering
Gentlemen:
.
Subject:
NRC Inspection at San Onofre Units 2 and 3
This refers to the inspections conducted by Mr. R. J. Pate of this
office during the period November 1-30, 1979 of activities authorized by
NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions of
his findings held with Mr. D. E. Nunn and other members of your staff on
November 2, 9 and 30, 1979.
Areas examined during this inspection are described in the enclosed
inspection report.. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter
views with personnel, and observations by the inspector. No items of
noncompliance with NRC requirements were identified within the scope of
this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10 Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
8 00 2070
(
Southern California Edison Company
-2
any proprietary information identified is contained in an enclosure to
the application since the application without the enclosure will also be
placed in the Public Document Room. If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them.with you.
Sincerely,
G. S. Spei cer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report