gtREGU

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

o

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

. 4WALNUT

CREEK, CALIFORNIA 94596

NOV 19 1979

Docket Nos.

50

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Mr. A. Arenal

Vice President

Gentlemen:

Subject: NRC Investigation at San Onofre Units 2 and 3

This refers to the investigation conducted by Messrs. J. H. Eckhardt, R. J.

Pate, and J. 0. Elin of this office on October 1-5, 1979, of construction

activities at SONGS Units 2 and 3 which are authorized by NRC Construction

Permit Nos..CPPR-97 and 98.

The investigation concerned a specific allegation

that splices exist in Class IE electrical cable installed at San Onofre.

The allegation was substantiated, however, Southern California Edison and the

constructor were previously aware of the splices and were pursuing the problem.

Areas examined during this investigation are described in the enclosed

investigation report. Within these areas, the investigation consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this investigation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en

closed investigation report will be placed in the NRC's Public Document

Room. If this report contains any information that you believe to be pro

prietary, it is necessary that you submit a written application to this

office, within 30 days of the date of this letter, requesting that such

information be withheld from public disclosure. The application must

include a full statement of the reasons why it is claimed that the infor

mation is proprietary. The application should be prepared so that any

~o~~60

9~

Southern California Edison Company

-2-

NOV 19 1979

proprietary information identified is contained in an enclosure to the

application, since the application without the enclosure will also be

placed in the Public Document Room. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this investigation, we will be

glad to discuss them with you.

Sincerely,

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/79-27

50-362/79-25

cc w/o enclosure:

J. H. Drake, Vice President

Engineering & Construction, SCE