SOUTHERN CALIFORNIA EDISON COMPANY TOPICAL REPORT SCE-1-A CHANGE NOTICE PAGE 1 OF 2 Change Notice Number:

37 Affected Amendment:

12 Affected Pages: 17.1-19, 17.1-50, 17.2-8, 17.2-16, 17.2-20, 17.2-64 Description of Change:

The Nuclear Oversight Division in-line review and approval of drawings and specifications is being revised to reflect the use of an audit, surveillance, and assessment program to monitor the adequacy of the design process.

Drawings and design specifications will no longer be reviewed and approved as an in-line function by the Nuclear Oversight Division. Appropriate surveillances, audits, and vertical assessments will be conducted to assure that drawings and specifications include appropriate quality assurance requirements.

Reason For Change (including basis for concluding that the change satisfies the criteria of 10CFR50, Appendix B, and the quality assurance program commitments previously accepted by the NRC):

The Nuclear Oversight Division is instituting a specialized function wherein selected design changes and systems are reviewed by a team of Nuclear Oversight Division personnel to assess the adequacy of the design, including potential impact on operations, using vertical assessment techniques.

This function will replace the in-line review function presently employed by the Nuclear Oversight Division which was limited to review of quality assurance requirements included in drawings and specifications. The organizations presently responsible for development, review, and approval of drawings and specifications are required to assure that these documents contain appropriate quality assurance requirements. The Nuclear Oversight Division will assure through appropriate surveillances and audits that process controls are maintained by the responsible organizations related to drawings and specifications to achieve compliance with regulatory requirements contained in 10CFR50, Appendix B, Criteria III, V, VI, and XVII. In addition, the new vertical assessment function will provide additional reviews of the technical adequacy of the plant design and changes thereto to ensure that the associated equipment will meet its intended safety function.

900517()22 0511 PDR AIAOCK 05000206 PPDC

0 e

SOUTHERN CALIFORNIA EDISON COMPANY TOPICAL REPORT SCE-1-A CHANGE NOTICE PAGE 2 OF 2 Reason For Change (Continued):

New initiatives undertaken by Southern California Edison to improve design control processes have been discussed with NRC Region V and Resident Inspectors.

It is anticipated that the new Nuclear Oversight Division focus on adequacy of technical performance will be significantly more effective than current in-line quality assurance reviews.

Additionally, the Organizational Chart, Figure 17.2-1, has been redrawn for better legibility and included for information.

Change X

does does not reduce commitments previously accepted by the NRC.

Approvals:

Manager of Nucaar Oversight Vici President Date Submitted to NRC:

May 11, 1990

List of Effective Pages (continued)

Page -No.

Amendment No.

Amendment 12 Change Notice #35 17.2-23 5

17.2-24 5

17-vii,17-1-2,17.1-3, 17.2-25 12 17.1-3a,17.1-4,17.1-6, 17.2-26 1

17.1-8,17.1-9,17.1-10 17.2-27 6

17.1-12,17.1-15,17.1-17 17.2-28 12 17.1-18,17.1-19,17.1-19a 17.2-29 12 17.1-21,17.1-22,17.1-24 17.2-30 5

17.1-27,17.1-28,17.1-29 17.2-31 5

17.1-35,17.1-36,17.1-37, 17.2-32 5

17.1-38,17.1-39,17.1-40 17.2-33 Original 17.1-41,17.1-42,17.1-43, 17.2-34 12 17.1-44,17.1-45,17.1-45a 17.2-35 12 17.1-50,17.1-51,17.2-3, 17.2-36 12 17.2-4,17.2-5,17.2-6,17.2-7a 17.2-37 10 17.2-8,17.2-9,17.2-11,17.2-12, 17.2-38 10 17.2-13,17.2-13a,17.2-16, 17.2-39 10 17.2-17,17.2-18,17.2-20, 17.2-39a 10 17.2-21,17.2-23,17.2-24 17.2-39b 10 17.2-25,17.2-27,17.2-29 17.2-40 12 17.2-30,17.2-32,17.2-33 17.2-41 12 17.2-35,17.2-36,17.2-38, 17.2-42 12 17.2-39a,17.2-39b,17.2-40 17.2-43 12 17.2-41,17.2-42,17.2-43 17.2-44 12 17.2-44,17.2-45,17.2-47 17.2-45 12 17.2-48,17.2-49,17.2-51 17.2-46 12 17.2-52,17.2-53,17.2-54 17.2-47 12 17.2-58 17.2-48 12 17.2-49 10 Amendment 12 17.2-50 10 Change Notice #36 17.2-51 6

17-vii, 17.0-2, 17.0-3, 17.2-52 5

17.0-4, 17.1-1, 17.1-4, 17.2-53 7

17.1-22, 17.1-32, 17.1-45, 17.2-54 12 17.1-50, 17.1-51, 17.2-1, 17.2-55 8

17.2-5, 17.2-6, 17.2-8, 17.2-56 6

17.2-10, 17.2-12, 17.2-25, 17.2-57 6

17.2-64 17.2-58 12 17.2-59 6

Amendment 12 17.2-60 6

Change Notice #37 17.2.61 6

17-vii, 17.1-19, 17.1-50, 17.2-62 6

17.2-8, 17.2-16, 17.2-20, 17.2-63 12 17.2-64 17.2-63a 12 17.2-64 7

17.2-65 7

17.A-1 1

17.A-2 1

17.A-3 1

17.A-4 1

17.A-5 1

17.A-6 2

17.A-7 2

17-vii Amendmentl2CN#37

17.1.5 INSTRUCTIONS, PROCEDURES, AND DRAWINGS

'17.1:5.1 Scope This subsection describes the measures utilized by SCE to assure that activities affecting quality are prescribed by, and accomplished in accordance with, appropriate instructions, procedures, and drawings.

17.1.5.2 Instructions, Procedures, and Drawings The SCE Quality Assurance Program includes provisions which require that work be accomplished in accordance with documented instructions, procedures, and drawings.

Instructions, procedures, and drawings are prepared, reviewed, 1

approved, and controlled by organizations which implement 421.6 Quality-Affecting Activities. These documents specify the requirements and/or methods to be utilized for compliance with the requirements of the SCE Quality Assurance Program. They include appropriate qualitative and quantitative acceptance criteria, as applicable, to determine that designated activities are accomplished in a satisfactory manner.

Instructions, procedures, and drawings, including revisions, 11CN#21 thereto, prepared by SCE are reviewed are approved by organiza tions responsible for the work. The Nuclear Oversight Division 12CN#35 reviews and approves prior to issuance quality assurance programmatic procedures and procedures which define inspection 11CN#21 nondestructive examination requirements. In addition, other quality affecting procedures are subject to review by the Nuclear Oversight Division at its discretion. Appropriate 12CN#35 surveillance, audits, and assessments will be conducted by 12CN#37 Nuclear Oversight Division to assure that quality affecting 12CN#37 instructions, procedures, drawings, and specifications comply with the quality assurance program requirements. Maintenance, modification and inspection procedures and work order 12CN#35 documentation are reviewed by the Nuclear Oversight Division to determine: (1) the need for inspection, identification of inspection personnel and documentation of inspection results; 11CN#21 and (2) that the inspection requirements, methods and acceptance criteria are identified.

l12CN#37 12CN#35 Changes to instructions, procedures, specifications, and draw-11CN21 ings are reviewed and approved in the same manner as original documents. Project Management personnel are responsible for assuring that instructions, procedures, and drawings, including revisions thereto, are reviewed by the appropriate SCE organi zations.

17.1-19 Amendment 12CN#37

TABLE 17.1-3 NUCLEAR OVERSIGHT DIVISION ACTIVITIES 12CN#35 DESIGN AND CONSTRUCTION 4

The following are SCE Nuclear Oversight Division personnel 12CN#36 activities during the design and construction of nuclear 12CN#35 generating stations:

4

1. Review and approve procurement documents to verify 12CN#37 incorporation of appropriate quality assurance requirements.
2. Develop quality assurance chapters for PSAR's and FSAR's and prepare quality assurance Topical Reports.
3. Prepare and maintain quality assurance manuals, procedures and instructions.
4. Review and approve quality assurance procedures and instructions developed by other internal organizations.
5. Evaluate and approve potential bidder's quality assurance manuals.

Conduct internal audits of SCE organizations.

6. Initiate nonconformance reports, corrective action reports, and followup to assure proper implementation of corrective action.

12CN#35

7. Participate in and provide quality assurance training.

12CN#35

8. Provide written reports to management regarding status of 12CN#35 activities, corrective actions required, or unresolved 12CN#36 problems.
9. Support the Corporate Documentation Management Centers and 12CN#36 Document Control Centers to assure proper filing and 12CN#35 retention of appropriate quality assurance documentation.

5 17.1-50 Amendment 12CN#37

TABLE 17.2-3 NUCLEAR OVERSIGHT DIVISION ACTIVITIES OPERATION 1l2CN#36 The following are Nuclear Oversight Division personnel 7

activities during the operational phase of nuclear generating stations including the support of Engineering Construction Projects (ECP's):

1.

Review and approve procurement documents to 5 1l2CN#37 verify inclusion of appropriate quality assurance requirements.

2.

Prepare and maintain quality assurance manuals, procedures, and instructions. Maintain quality assurance chapters in FSAR's current. Maintain Topical Reports.

3.

Review and approve quality assurance procedures and instructions prepared by other internal organizations.

4.

Evaluate and approve potential supplier's quality assurance manuals.

5

5.

Perform quality assurance preaward surveys of potential suppliers' facilities and quality assurance programs.

6.

Perform inspection and surveillance at supplier's facilities.

7.

Conduct internal surveillances, audits, and assessments 12CN#37 of SCE organizations and external audits of A-E's or other contractors and suppliers to SCE. Reaudit to verify implementation of corrective action.

8.

Initiate nonconformance reports, corrective action reports, and follow up to assure proper implementation of corrective action.

9.

Participate in and provide quality assurance training.

10.

Provide written reports to management regarding status of 7

quality assurance activities, corrective actions required, or unresolved problems.

11.

Support the Corporate Documentation Management Center 7

to assure proper filing and retention of appropriate quality assurance documentation.

17.2-64 Amendment 12CN#37

17.2.3.2 (continued) stress, thermal, hydraulic, radiation, and accident analyses.

Consultants may be utilized to review and verify the design of certain items.

Where design verification cannot be adequately accomplished by the design review process, alternate calculations or qualification testing is employed. These alternate methods of design verification are required to be defined in design documentation.

Records of design reviews, and associated design documents are 5

required by internal written procedures to be maintained in the 12CN#35 SONGS CDM Center.

The SCE Nuclear Oversight Division is responsible for performing 12CN#35 periodic audits, as described in Subsection 17.2.18, of SCE departments, A-E's, and other contractors to verify effective implementation of design control requirements. These audits include verification that appropriate design review records are maintained and deviations from quality standards are controlled.

17.2.3.2.1 Engineering Construction Projects (ECP's)

For ECPs, the following measures are applied in addition to 5(CN#2) those defined in 17.2.3.2.

Design work associated with ECP's at nuclear generating stations is performed by the Nuclear Engineering, Safety and Licensing 12CN#31 Department and Nuclear Generation Site Department or contracted.

In either case, a Project Manager is assigned overall responsi bility for management and control of the ECP's, including design 4 interfaces. The Nuclear Oversight Division performs, or 12CN#35 delegates to qualified contractors, the pertinent quality assurance activities.

The Project Engineer is responsible for assuring that ECP design documentation, and changes thereto, are distributed by SONGS CDM Center to responsible individuals with established 5

review request forms in a timely manner. He is also responsible for assuring that errors and deficiencies noted in the review 12CN#35 comments are corrected or otherwise resolved.

Safety-Related design documentation and changes thereto prepared by an A-E or contractor for ECP's are controlled in accordance with their SCE-approved quality assurance programs. In addition, selected documents are required by written procedures to be submitted to SCE for design review and approval. This review is performed by cognizant Nuclear Generation Site and Nuclear 12CN#31 Engineering, Safety and Licensing Departments in accordance 12CN#35 with internal written procedures similar to those for 12CN#37 SCE-prepared documentation.

17.2-16 Amendment 12CN#37

17.2.5 INSTRUCTIONS, PROCEDURES, AND DRAWINGS 17.2.5.1 Scope This subsection describes the measures utilized by SCE to assure that activities affecting quality are prescribed by, and accomplished in accordance with appropriate instructions, procedures, and drawings.

17.2.5.2 Instructions, Procedures, and Drawings The SCE Quality Assurance Program includes provisions which require that work be accomplished in accordance with documented instructions, procedures, and drawings.

Instructions, procedures, and drawings are prepared,

reviewed, approved, and controlled by individuals and organizations which implement Quality-Affecting Activities. These documents specify the requirements and/or methods to be utilized for compliance with the SCE Quality Assurance Program.

They include appropriate qualitative and quantitative acceptance criteria, as applicable, to determine that designated activities are accomplished in a

satisfactory manner.

Instructions, procedures, and specifications prepared by station personnel for control of design are reviewed and 11CN21 approved by the Station Manager or designated representative.

The Nuclear Oversight Division reviews and approves prior to 11CN21 issuance quality assurance programmatic procedures and procedures 12CN#35 which define inspection/nondestructive examination requirements.

In addition, other quality affecting procedures are subject to review by the Nuclear Oversight Division at its discretion.

12CN#35 Appropriate surveillances, audits, and assessments will be 112CN#37 conducted by the Nuclear Oversight Division to assure that quality affecting instructions, procedures, drawings, and 12CN#35 specifications comply with the quality assurance program require-112(2#37 ments. Maintenance, modification and inspection procedures and work order documentation are reviewed by the Nuclear 12CN#35 Oversight Division to determine: (1) the need for inspection, identification of inspection personnel and documentation of inspection results; and (2) that the inspection requirements, methods, and acceptance criteria are identified.

l12CN#37 12CN#35 Changes to approved instructions, procedures, specifications, and drawings are reviewed and approved in the same manner as original documents.

The SCE Nuclear Oversight Division verifies by means of 1l2CN#35 audits, as described in Subsection 17.2.18, that instructions, procedures, and drawings required for performing Safety-Related activities are controlled in compliance with established program commitments.

17.2-20 Amendment 12CN#37