ML13322B085
| ML13322B085 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/17/1990 |
| From: | SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML13322B084 | List: |
| References | |
| NUDOCS 9001240169 | |
| Download: ML13322B085 (17) | |
Text
1. Oe-05 FIGURE A Baseline and Long Term Criteria Curves S--End of Cycle For SONGS I Neutron Noise Monitoring
-Detector 1205, Upper S1.e-06Beginning of Cycle 1.0e-07 CD 1.0e-08 Curve 3 Curve 2 Curve 1
- a.
1.0e-09 270 1
Curve 4 2Curve 5 1800 00 Curve 6 1.0e-10 900 I
1205 1206 Detector Locations 1 0 11 0.0 10.0 20.0 HIz Frequency (Hz)
W.stinghowso Propriotary I s it N. :troi Nw., Rev 1 2
1.0e-05 FIGURE B Baseline and Long Term Criteria Curves End of Cycle For SONGS 1 Neutron Noise Monitoring 1
0Beginning of Cycle-Detector 1205, Lower 1.0e-06
-Beinn ofCce_________________
1.0e-07 04 1.0e-08 Curve 3 Z4 Curve 2 0
Curve 4
.Curve 5 0*
Curve 6 1.0e-10 900 1205 1206 Detector Locations 1.0e-11 0.0 10.0 20.0 I
Iz Frequency (Hz)
W C
nghow.
Propr,
ry
1.005e FIGURE C Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring End of Cycle-Detector 1206, Upper 1.0e-06 Edo yl Beginning of Cycle 1.0e-07 co 1.0e-08 U)
Curve 3 Curve 2 Curve 1 1.0e-09 1207 1208 2700 090 1.0e-10 900 1205 1206 Curve 4 Curve 5 Detecto Locations Curve 6 1.0e-11 I
0.0 10.0 20.0 Frequency (Hz) lz N-noi t
1.
1.0e-05 FIGURE D Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring End of Cycle
- Detector 1206, Lower 1.0e-06
-Beginning of Cycle 1.0e-07
~z 1.0e-08 00 C) 1.0e-09 1 0O 1208 1.O e -1 0
-o0 1206 Detector Locations Curve 6 1.0e0 11 0.0 10.0 20.0 Frequency (Hz)
N.
to N
H 14' 1 2 Th1 n
r 01 I
14t 0
1.0e-05 FIGURE E Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring
- Detector 1207, Upper 1.0e-06 End of Cycle Beginning of Cycle 1.0e-07 00 1.0e-08
-uv Curve 3
)
-Curve 1 a
1.0e-09 1207 10 1208 Curve 4 2700 0 Curve 5 180*
0-Curve 6 1.0e-10 900 1205 1206 Detector Locations 1.De-1 11 0.0 10.0 20.0 F1r c
Frequency (Hz)
1.0e-05 FIGURE F Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring End of Cycle
- Detector 1207, Lower 1.0e Beginning of Cycle 1.0e-07
- z 1.0e-08
- Curve 3 0
0V
- Curve 2
- Curve 1 1
.e-09
-Curve 4
- Curve 5 180 00
-Curve 6 1.0e-10 900 120S 1206 Detector Locations 1.0e-11 1
0.0 10.0 26.0 Frequency (Hz) 1Iz
1.0e-05 FIGURE G Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring
- Detector 1208, Upper 1.Oe-06 End of Cycle Beginning of Cycle 1.0e-07 z
1.0e-08 o
0
-Curve 3
- Curve 2
- Curve 1 1.Oe-09 1207 1208 180 0 0*
1206 Curve 4
~
Curve 5 Detector Locations Curve 6 1.0e-11 0.0 10.0 20.0 Hz Frequency (Hz)
We,.tinghous,, Propr iotary (.
N wtron Nojw
,' lv 2
1.0e-05 FIGURE H Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring
- Detector 1208, Lower 1.0e-06 End of Cycle Beginning of Cycle 1.Oe-07 0
S 1.0e-08
- 0)
Curve 3 1.0e-09 1207 1208 Curve 2 270*
Curve 1 180*
00 1.0e-10O0 1206 Curve 4 Curve 5 Detector Locations Curve 6 1.0e-11 0.0 10.0 2(0.
Frequency (Hz)
W[tng oe ro~pn.tar y I <
I N,
iton N1 H'v 1 2 T!
[
I-i
. 1, 7 i' f
1.0e-05 FIGURE A Baseline and Long Term Criteria Curves n_
End of Cycle For SONGS 1 Neutron Noise Monitoring B
no y-Detector 1205, Upper Mo-Beginning of Cycle
- 0) 17 1.0e-07 cn
'yCurve 5
-0 U
0Curve 6
1.0e-09 127 0
0 1.2700 Curve 4 Curve 5 18*
0*Curve 6
1.0e-1090 120 1205 1.00 11 0.0 10.0 20.0 Hz Frequency (Hz)
Westinghouse Proprietary Class II NPulron Noise Rev. 1.2 Thu Dec 14 15:36:27 1989
1.0e-05 FIGURE B Baseline and Long Term Criteria Curves.
End of Cycle For SONGS 1 Neutron Noise Monitoring 1.e-06 Beginning of Cycle Detector 1205, Lower 1.0e-07 C4 1.0e-08.
Curve 3 Curve 2 0
co-Curve 1 0
1.0e-09 1207 27*1208Cuv4 Curve 5 1800 00 Curve 6 1.0e-10 900 1205 1206 Detector Locations 1.0e-11 0.0 10.0 20.0 Hz Frequency (Hz)
Weslinghouse Proprietary Class II Neution Noise Rev. 1.2 Thu Dec 14 15:36:56 1989
1.Oe-05 FIGURE C Baseline and Long Terrn Criteria Curves For SONGS 1 Neutron Noise Monitoring 1.0e-06 End of Cycle Detector 1206, Upper Beginning of Cycle 1.0e-07
- 0)
C 1.0e-08 Curve 3 Curve 2 Curve 1 1.0e-09 1207 1208 2700 1800 00 1.0e-10 900 1205 1206ne Detector Locations Curve 6 1.Oe-I1 1 0.0 10.0 20.0 li]z Frequency (Hz)
Westinghouse Proprietary Class lI Neutron Noise Rev. 1.2 Thu Dec 14 16:43:14 1989
1.0e-05 FIGURE D Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring End of Cycle
- Detector 1206, Lower 1.0e-06 Beginning of Cycle 1.0e-07 02 C\\11 1.0e-08 1206Crv Cuv3 Curverv 52 11.0e-09 Detector Locations Curve 1.0e-0 11 0.0 10.0 20.0 Frequency (Hz)lz Westinghouse Proprietary Class lI Neutron Noise Rev. 1.2 Thu Dec 14 16:43:58 1989
1.0e-05
-FIGURE E
Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring 1.Oe-06 End of Cycle Detector 1207, Upper Beginning of Cycle 1.0e-07 OD 1.0-0 Curve 3 z 1.0e-08.
-Curve 2 U)-
Curve 1 1.0e-09 1207 1208 0
Curve 4
-Curve 5 1800 00 Curve 6 1.0e-10 900 1205 1206 Detector Locations 1.0e-11II 0.0 10.0 20.0 Frequency (Hz)
Westinghouse Proprielary Class 11 Neutron Noise Rev. 1.2 Thu Dec 14 15:39:24 1989
1.0e-05 FIGURE F Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitorin9
-.0e-06 End of Cycle Detector 1207, Lower Beginning of Cycle 1.Oe-07 1.0e-08 Curve 3 a)
- Curve 2 o
Curve 1 1.0e-09 1207 1208
-Detector Locations 10 e-11 1
080 00 10.0e
- 26.
0.00 Frequency (Hz)
Westinghouse Proprietary Class 11 Neutron Noise Rev. 1.2 Thu Dec 11 15:39:52 1989
1
.Oe-05 FIGURE G Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring
-Detector 1208, Upper 1.Oe-06 End of Cycle Beginning of Cycle 1.0e-07 O) coJ C\\l 1.0e-08 Curve 3
- Curve 2
- Curve 1 1.0e-09 1207 1208 2700 1800 00 1.0e-10 1C Curve 5
-I 1 Detector Locations Curve 6 0.0 10.0 20.0 Hz Frequency (Hz)
Westinghouse Proprietary Class I Noutron Noise Rev. 1.2 Thu Dec 14 16:44:35 1989
1.0e-05 FIGURE H Baseline and Long Term Criteria Curves For SONGS 1 Neutron Noise Monitoring
- Detector 1208, Lower 1.0e-06 End of Cycle Beginning of Cycle 1.0e-07 co 1.0e-08 j
0 Curve 3 1.0e-09 Z 1207 1208 Curve 2
-2700 Curve 1
-1800 00 1.0e-10 1205 1206 Curve 4 Curve 5 Detector Locations Curve 6 1.0e-110 0.0 10.0 20.0 Frequency (Hz)
I-lz Westinghouse Proprietary Class 11 Neutron Noiso Rev. 1.2 Thu Dec 14 16:45:07 1989
4 Southern California Edison Company 23 PARKER STREET IRVINE. CALIFORNIA 92718 R.M.ROSENBLUM January 17 1990E MANAGER OF (714) 587-5420 NUCLEAR REGULATORY AFFAIRS U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Final Acceptance Criteria for the Thermal Shield Monitoring Program San Onofre Nuclear Generating Station Unit 1 The enclosure to this letter provides the final acceptance criteria for the reactor vessel thermal shield monitoring program in accordance with Provisional Operating License DPR-13 License Condition 3.M, "Cycle X Thermal Shield Monitoring Program."
Interim acceptance criteria were previously provided to the NRC by letter dated September 6, 1989. On October 4, 1989 SCE received a telecopy of the staff's Safety Evaluation of the interim acceptance criteria which included six recommendations to be incorporated in the final acceptance criteria. This Safety Evaluation was later transmitted to us by letter dated November 3, 1989. These recommendations have been included in the final criteria.
The thermal shield monitoring program in conjunction with the enclosed acceptance criteria will provide sufficient indication of the thermal shield condition to assure the safe operation of Unit 1.
If you have any questions or desire further information, please contact me.
Very truly yours,
Enclosure:
cc:
J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 PDC 1