ML13322A762

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800404 Application Re Proposed Tech Spec Changes 91 & 92 & Two Class III Amend Fees.Ofc of Controller Has Been Authorized to Refund Class III Fee for Tech Spec Change 92.Amend Fee Waivered
ML13322A762
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/25/1980
From: Miller W
Office of Administration
To: Dietch R
Southern California Edison Co
References
NUDOCS 8005220166
Download: ML13322A762 (1)


Text

REGULAVOR VE4 T RE COPY APR 2 5 1980 DOCKET NO.

50-206 Southern California Edison Company ATTN:

Mr. Robert Dietch Vice President 2244 Walnut Grove Avenue P.O. Box 800 Rosemead, California 91770 Gentlemen:

Your application Amendment No. 90, dated April 4, 1980, filed with the Office of Nuclear Reactor Regulation (ONRR), included Proposed Changes 91 and 92 to the Technical Specifications for San Onofre 1 and two Class III amendment fees of $4,000 each. The Commission's Office of the Controller has been authorized to refund the one Class III fee for.Technical Specification Change 92 because we have determined that a waiver of license amendment fees for this technical specification change relating to fire protection is appropriate.

The refund is being processed and will be sent to you as soon as possible.

Sincerely, Driginal Signed by LWm. C. Miller William 0. Miller, Chief License Fee Management Branch Office of Administration DISTRIBUTION:

PDR LPDR L~qrJmet F ilIe LFMB Reactor File(3)

A. Burger, ORB-2 H. Smith, ORB-2 R. Diggs, LFMB R/F (2)

OFFICE

_.LFMB.
A L
A LFM...M LF. B: ADM.....

SURNAME

.ES ou LF 1 CJH.l..way. WQMj. ar.............

DATE 0

4/a80 4

/80 4

80 NoC FORM 318 (9-76) NRCM 2 0

.S GOVERNMENT PRINTING OFFICE: 1979-289-369